My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Agenda and Packet 2025 03 13
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2025 Planning Commission Agendas Packets Minutes
>
Planning Commission Agenda and Packet 2025 03 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 11:58:30 AM
Creation date
3/27/2025 11:05:56 AM
Metadata
Fields
Template:
City Council Records
Meeting Date
3/13/2025
Doc Type
Boards Commissions Committees Records
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
King Soopers 142 <br />Louisville, CO <br />As shown on Table 4-1, under background future 2026 conditions the intersections in the study area are <br />forecasted to operate consistent with existing conditions. <br />Under background future 2045 conditions the signalized intersections in the study area are forecasted to <br />operate at acceptable overall LOS "D" or better during the weekday peak hours with the exception of the <br />Dillon Rd & McCaslin Blvd intersection which is expected to operate at LOS "E" in the 2045 weekday PM <br />peak hour. The unsignalized intersection movements in the study area are expected to operate at <br />acceptable LOS "C" or better during the weekday peak hours. <br />Background Future Queueing <br />An analysis of intersection queues was performed at key locations under background future traffic <br />conditions. The results of the queuing analysis are summarized in Table 4-2. <br />As shown in the table, queues within the study network will increase due to assumed regional traffic growth. <br />All queues are expected to be contained in their effective storage during background conditions with the <br />exception of the eastbound left movement at the Centennial Pkwy & McCaslin Blvd intersection during the <br />background future long range (2045) weekday AM peak hour. <br />Galloway & Company, Inc. <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.