Laserfiche WebLink
3. Fenestration U-factor and solar heat gain coefficients <br />(SHGCs). <br />4. Area -weighted U-factor and solar heat gain coefficient <br />(SHGC) calculations. <br />5. Mechanical system design criteria. <br />6. Mechanical and service water heating systems and <br />equipment types, sizes, fuel source and efficiencies. <br />7. Economizer description. <br />8. Equipment and system controls. <br />9. Fan motor horsepower (hp) and controls. <br />10. Duct sealing, duct and pipe insulation and location. <br />11. Lighting fixture schedule with wattage and control <br />narrative. <br />12. Location and daylight zones on floor plans. <br />13.Air barrier and air sealing details, including the location of <br />the air barrier. <br />14. Details of additional electric infrastructure, including <br />branch circuits, conduit, or pre -wiring, and panel capacity <br />in compliance with the provisions of this code. <br />15. Location of pathways for routing of raceways or cable from <br />the solar ready zone to the electrical service panel. <br />3. Section C202 General Definitions, is hereby amended by adding or <br />replacing, in alphabetical order, the following definitions: <br />All -Electric Building: A building that contains no combustion equipment, <br />and no piping or plumbing for combustion equipment; installed within the <br />building or building site, except that for existing buildings that contain <br />piping and plumbing for combustion equipment, the piping and plumbing <br />may remain but must be abandoned and capped. An All -Electric building <br />may have a fuel fired back up generator. <br />Combustion Equipment: Any equipment or appliance used for space <br />heating, service water heating, cooking, clothes drying, and/or lighting <br />that uses fuel gas or fuel oil. <br />