My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2024-1876
PORTAL
>
CITY COUNCIL RECORDS
>
ORDINANCES (45.120)
>
2024 Ordinances
>
Ordinance 2024-1876
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 10:59:55 AM
Creation date
4/7/2025 10:57:57 AM
Metadata
Fields
Template:
City Council Records
Also Known As (aka)
2021 IECC Update
Meeting Date
1/21/2025
Doc Type
Ordinance
Signed Date
1/21/2025
Ord/Res - Year
2024
Ord/Res - Number
1876
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
where interruption of the primary power could create hazards or hamper <br />rescue or fire -fighting operations. <br />Tenant Finish: The first tenant occupying a space(s) in a core and shell. <br />Multiple tenants may be considered as a tenant finish until the entire <br />space within the core and shell has had a tenant. Once a space within <br />a core and shell has been occupied it becomes an existing building. <br />4. C401.2. Commercial buildings shall comply with SeGtien G401.2.1 one <br />of the following, as applicable <br />C401.2.1 Performance targets. New commercial building types included <br />in the scope of Appendix PT shall comply with Appendix PT and <br />Sections C403.2.4 and C404.10. <br />C401.2.2 Core and shell. Core and shell buildings shall comply with the <br />provisions of Section C402.1.3 through C402.5. When mechanical <br />systems are installed, core and shell buildings shall also meet the <br />provisions in C403.2.4, C404.10, and Section C408. <br />C401.2.2.1 Core and shell buildings shall submit a letter of agreement <br />to the City stating the tenant spaces included in the scope of Appendix <br />PT shall meet the EUI target established in Table PT103 and shall <br />include these requirements in their lease or purchase agreements. <br />C401.2.3 Tenant finish. Tenant finishes included in the scope of <br />Appendix PT shall comply with Appendix PT and C403.2.4 and C404.10. <br />All other tenant finishes shall comply with the Prescriptive Compliance <br />option, which requires compliance with Sections C401.3, C401.4, C402 <br />through C406, and C408. <br />C401.2.4 Other commercial building types. Commercial building types <br />not included above, including additions, shall comply with the <br />Prescriptive Compliance option, which requires compliance with <br />Sections C401.3, C401.4, C402 through C406, and C408. <br />Exception: Additions, alterations, Alterations, repairs, and changes of <br />occupancy to existing buildings complying with Chapter 5. <br />5. Section C401.2.1 International Energy Conservation Code, is hereby <br />deleted and replaced to read as follows: <br />C401.2.1 International Energy Conservation Code <br />Commercial buildings shall be built all -electric unless the fuel <br />gas options of C403.3.2 and the additional electric infrastructure requirements <br />of C405.14 are met. All buildings must comply with the following: <br />
The URL can be used to link to this page
Your browser does not support the video tag.