My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2025-44
PORTAL
>
CITY COUNCIL RECORDS
>
RESOLUTIONS (45.160)
>
2025 Resolutions
>
Resolution 2025-44
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2025 11:33:07 AM
Creation date
7/24/2025 9:41:55 AM
Metadata
Fields
Template:
City Council Records
Also Known As (aka)
APPROVING AN AGREEMENT WITH BARNARD STRUCTURES, INC
Meeting Date
7/8/2025
Doc Type
Resolution
Signed Date
7/8/2025
Ord/Res - Year
2025
Ord/Res - Number
44
City Property Name
Facilities Water Treatment Plant Sid Copeland
Project Name
HOWARD BERRY AND SID COPELAND WATER TREATMENT PLANTS CHLORINE DIOXIDE FEED SYSTEMS REPLACEMENT PROJECT NUMBER: 501498-640167
Cross-Reference
HOWARD BERRY AND SID COPELAND WATER TREATMENT PLANTS
Quality Check
7/24/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
resolution thereof by ENGINEER is acceptable to CONTRACTOR, and the Contract <br />Documents are generally sufficient to indicate and convey understanding of all terms and <br />conditions for performance and furnishing the Work. <br />ARTICLE 6. CONTRACT DOCUMENTS <br />The Contract Documents, which constitute the entire agreement between OWNER and <br />CONTRACTOR concerning the Work, are all written documents, which define the Work and the <br />obligations of the Contractor in performing the Work and the OWNER in providing compensation for <br />the Work. The Contract Documents include the following: <br />6.1 Invitation to Bid <br />6.2 Instruction to Bidders <br />6.3 Bid Form <br />6.4 This Agreement <br />6.5 General Conditions <br />6.6 Supplementary Conditions — N/A <br />6.7 General Requirements <br />6.8 Technical Specifications <br />6.9 Drawings <br />6.10 Change Orders, Addenda and other documents which may be required or specified including: <br />6.10.1 Addenda No. 0 to 1 exclusive <br />6.10.2 Documentation submitted by CONTRACTOR prior to Notice of Award. <br />6.10.3 Schedule of Subcontractors/References <br />6.10.4 Anti -Collusion Affidavit <br />6.10.5 Certification of EEO Compliance <br />6.10.6 Contractor's Pre -Contract Certification Regarding Employing Illegal Aliens <br />6.10.7 Notice of Award <br />6.10.8 Performance Bond <br />6.10.9 Labor and Material Payment Bond <br />6.10.10 Certificates of Insurance <br />6.10.11 Notice to Proceed <br />6.10.12 Contractor's Proposal Request <br />6.10.13 Contractor's Overtime Request <br />6.10.14 Field Order <br />6.10.15 Work Change Directive <br />6.10.16 Change Order <br />6.10.17 Application for Payment <br />6.10.18 Certificate of Substantial Completion <br />6.10.19 Claim Release <br />6.10.20 Final Inspection Report <br />6.10.21 Certificate of Final Completion <br />6.10.22 Guarantee Period Inspection Report <br />26 <br />HBWTP & SCWTP Chlorine Dioxide Feed Systems Replacement Bid Form <br />
The URL can be used to link to this page
Your browser does not support the video tag.