BASE BID
<br />ESTIMATED UNITS/ UNIT PRICE Brannan Construction Company
<br />Bid Item Bid Item Unit Quantity Unit Price Total Cost
<br />No.
<br />1 12" PVC WATER MAIN CLASS 235 DR 18 LF 102 $ 184.00 $18,768.00
<br />2 8" PVC WATER MAIN CLASS 235 DR 19 LF 2497 $ 90.00 $224,730.00
<br />3 REMOVE FIRE HYDRANT ASSEMBLY EA 3 $ 1,584.00 $4,752.00
<br />4 FIRE HYDRANT ASSEMBLY EA 6 $ 11,608.00 $69,648.00
<br />5 FIRE HYDRANT EXTENSION (6") EA 6 $ 2,989.00 $17,934.00
<br />6 FIRE HYDRANT EXTENSION (12") EA 6 $ 3,173.00 $19,038.00
<br />7 12" 45 DEGREE BEND EA 2 $ 1,996.00 $3,992.00
<br />8 12"-8" REDUCER EA 1 $ 1,252.00 $1,252.00
<br />9 12" SOLID SLEEVE EA 1 $ 2,073.00 $2,073.00
<br />10 12"CAP EA 1 $ 1,594.00 $1,594.00
<br />11 GATE VALVE AND BOX (8") EA 11 $ 3,229.00 $35,519.00
<br />12 8"x8"x8" SWIVEL TEE EA 6 $ 1,581.00 $9,486.00
<br />13 8"x6"x8" SWIVEL TEE EA 6 $ 1,471.00 $8,826.00
<br />14 8" SOLID X SWIVEL ADAPTER EA 8 $ 1,302.00 $10,416.00
<br />15 8" 111/4 DEGREE BEND EA 8 $ 1,240.00 $9,920.00
<br />16 8" SOLID SLEEVE EA 13 $ 1,309.00 $17,017.00
<br />17 4" CAP EA 9 $ 836.00 $7,524.00
<br />18 8" CAP EA 5 $ 975.00 $4,875.00
<br />19 ABANDON EXISTING VALVE AND BOX EA 8 $ 802.00 $6,416.00
<br />20 WATER SERVICE CONNECTION 3/4" SHORT EA 32 $ 1,692.00 $54,144.00
<br />21 WATER SERVICE CONNECTION 3/4" LONG EA 24 $ 2,146.00 $51,504.00
<br />22 REMOVE AND REPLACE 3/4" WATER EA 8 $ 2,615.00 $20,920.00
<br />SERVICE
<br />23 REMOVE AND REPLACE 3/4" CURB STOP EA 8 $ 634.00 $5,072.00
<br />AND BOX
<br />24 STRUCTURE BACKFILL (COMPLETE IN TN 225 $ 61.00 $13,725.00
<br />PLACE)
<br />25 POTHOLING EA 93 $ 625.00 $58,125.00
<br />26 24" VERTICAL CURB AND GUTTER LF 29 $ 147.00 $4,263.00
<br />27 4" CONCRETE SF 140 $ 19.00 $2,660.00
<br />28 6'-0" x 6" CURBWALK LF 20 $ 23.00 $460.00
<br />29 8" CONCRETE WITH FIBERMESH SF 610 $ 25.00 $15,250.00
<br />30 FLOW FILL CY 61 $ 375.00 $22,875.00
<br />31 HOT ASPHALT PATCH GRADE SX (6") SY 2000 $ 86.00 $172,000.00
<br />32 HOT ASPHALT PATCH GRADE SX (9") SY 122 $ 133.00 $16,226.00
<br />33 CONSTRUCTION ZONE TRAFFIC CONTROL LS 1 $ 69,500.00 $69,500.00
<br />$ 980,504.00
<br />ESTIMATNITS/CONTRAC
<br />SANITARY
<br />D U�R�TER VALVE
<br />Brannan Construction Company
<br />Bid Item Bid Item Unit Quantity Unit Price Total Cost
<br />No.
<br />34 4" BACKWATER VALVE KIT EA 4 $ 1,331.00 $5,324.00
<br />35 SCHEDULE 40 PVC PIPE (4") LF 40 $ 143.00 $5,720.00
<br />36 SCHEDULE 40 PVC PIPE (6") LF 40 $ 173.00 $6,920.00
<br />37 SANITARY SEWER SERVICE PIPE LF 20 $ 885.00 $17,700.00
<br />SDR 35 (4")
<br />STRONG BACK COUPLING (4")
<br />FITTINGS SDR 35 (4")
<br />24" VERTICAL CURB AND GUTTER
<br />4" CONCRETE
<br />38
<br />39
<br />40
<br />41
<br />42
<br />43
<br />44
<br />45
<br />COVER
<br />LANDSCAPE RESTORATION
<br />EA
<br />EA
<br />LF
<br />SF
<br />EA
<br />LS
<br />HOT ASPHALT PATCH GRADE SX (6") SY
<br />CONTROL LS
<br />16
<br />15
<br />20
<br />40
<br />2
<br />1
<br />10
<br />1
<br />$ 253.00
<br />$ 838.00
<br />$ 147.00
<br />$ 19.00
<br />$ 1,816.00
<br />$ 19,035.00
<br />$ 86.00
<br />$ 13,900.00
<br />$4,048.00
<br />$12,570.00
<br />$2,940.00
<br />$760.00
<br />$3,632.00
<br />$19,035.00
<br />$860.00
<br />$13,900.00
<br />$ 93,409.00
<br />Total Base Bids: $ 1,073,913.00
<br />
|