Laserfiche WebLink
BASE BID <br />ESTIMATED UNITS/ UNIT PRICE Brannan Construction Company <br />Bid Item Bid Item Unit Quantity Unit Price Total Cost <br />No. <br />1 12" PVC WATER MAIN CLASS 235 DR 18 LF 102 $ 184.00 $18,768.00 <br />2 8" PVC WATER MAIN CLASS 235 DR 19 LF 2497 $ 90.00 $224,730.00 <br />3 REMOVE FIRE HYDRANT ASSEMBLY EA 3 $ 1,584.00 $4,752.00 <br />4 FIRE HYDRANT ASSEMBLY EA 6 $ 11,608.00 $69,648.00 <br />5 FIRE HYDRANT EXTENSION (6") EA 6 $ 2,989.00 $17,934.00 <br />6 FIRE HYDRANT EXTENSION (12") EA 6 $ 3,173.00 $19,038.00 <br />7 12" 45 DEGREE BEND EA 2 $ 1,996.00 $3,992.00 <br />8 12"-8" REDUCER EA 1 $ 1,252.00 $1,252.00 <br />9 12" SOLID SLEEVE EA 1 $ 2,073.00 $2,073.00 <br />10 12"CAP EA 1 $ 1,594.00 $1,594.00 <br />11 GATE VALVE AND BOX (8") EA 11 $ 3,229.00 $35,519.00 <br />12 8"x8"x8" SWIVEL TEE EA 6 $ 1,581.00 $9,486.00 <br />13 8"x6"x8" SWIVEL TEE EA 6 $ 1,471.00 $8,826.00 <br />14 8" SOLID X SWIVEL ADAPTER EA 8 $ 1,302.00 $10,416.00 <br />15 8" 111/4 DEGREE BEND EA 8 $ 1,240.00 $9,920.00 <br />16 8" SOLID SLEEVE EA 13 $ 1,309.00 $17,017.00 <br />17 4" CAP EA 9 $ 836.00 $7,524.00 <br />18 8" CAP EA 5 $ 975.00 $4,875.00 <br />19 ABANDON EXISTING VALVE AND BOX EA 8 $ 802.00 $6,416.00 <br />20 WATER SERVICE CONNECTION 3/4" SHORT EA 32 $ 1,692.00 $54,144.00 <br />21 WATER SERVICE CONNECTION 3/4" LONG EA 24 $ 2,146.00 $51,504.00 <br />22 REMOVE AND REPLACE 3/4" WATER EA 8 $ 2,615.00 $20,920.00 <br />SERVICE <br />23 REMOVE AND REPLACE 3/4" CURB STOP EA 8 $ 634.00 $5,072.00 <br />AND BOX <br />24 STRUCTURE BACKFILL (COMPLETE IN TN 225 $ 61.00 $13,725.00 <br />PLACE) <br />25 POTHOLING EA 93 $ 625.00 $58,125.00 <br />26 24" VERTICAL CURB AND GUTTER LF 29 $ 147.00 $4,263.00 <br />27 4" CONCRETE SF 140 $ 19.00 $2,660.00 <br />28 6'-0" x 6" CURBWALK LF 20 $ 23.00 $460.00 <br />29 8" CONCRETE WITH FIBERMESH SF 610 $ 25.00 $15,250.00 <br />30 FLOW FILL CY 61 $ 375.00 $22,875.00 <br />31 HOT ASPHALT PATCH GRADE SX (6") SY 2000 $ 86.00 $172,000.00 <br />32 HOT ASPHALT PATCH GRADE SX (9") SY 122 $ 133.00 $16,226.00 <br />33 CONSTRUCTION ZONE TRAFFIC CONTROL LS 1 $ 69,500.00 $69,500.00 <br />$ 980,504.00 <br />ESTIMATNITS/CONTRAC <br />SANITARY <br />D U�R�TER VALVE <br />Brannan Construction Company <br />Bid Item Bid Item Unit Quantity Unit Price Total Cost <br />No. <br />34 4" BACKWATER VALVE KIT EA 4 $ 1,331.00 $5,324.00 <br />35 SCHEDULE 40 PVC PIPE (4") LF 40 $ 143.00 $5,720.00 <br />36 SCHEDULE 40 PVC PIPE (6") LF 40 $ 173.00 $6,920.00 <br />37 SANITARY SEWER SERVICE PIPE LF 20 $ 885.00 $17,700.00 <br />SDR 35 (4") <br />STRONG BACK COUPLING (4") <br />FITTINGS SDR 35 (4") <br />24" VERTICAL CURB AND GUTTER <br />4" CONCRETE <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />COVER <br />LANDSCAPE RESTORATION <br />EA <br />EA <br />LF <br />SF <br />EA <br />LS <br />HOT ASPHALT PATCH GRADE SX (6") SY <br />CONTROL LS <br />16 <br />15 <br />20 <br />40 <br />2 <br />1 <br />10 <br />1 <br />$ 253.00 <br />$ 838.00 <br />$ 147.00 <br />$ 19.00 <br />$ 1,816.00 <br />$ 19,035.00 <br />$ 86.00 <br />$ 13,900.00 <br />$4,048.00 <br />$12,570.00 <br />$2,940.00 <br />$760.00 <br />$3,632.00 <br />$19,035.00 <br />$860.00 <br />$13,900.00 <br />$ 93,409.00 <br />Total Base Bids: $ 1,073,913.00 <br />