My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2025 07 08
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2025 City Council Agenda and Packets
>
City Council Agenda and Packet 2025 07 08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2025 3:49:18 PM
Creation date
7/24/2025 3:08:25 PM
Metadata
Fields
Template:
City Council Records
Meeting Date
7/8/2025
Doc Type
City Council Packet
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LCity,/ <br />Louisville <br />COLORADO • SINCE 1878 <br />CITY COUNCIL COMMUNICATION <br />AGENDA ITEM 7B <br />SUBJECT: RESOLUTION NO. 43, SERIES 2025 — A RESOLUTION <br />APPROVING AN AGREEMENT FOR THE 2025 WATER MAIN <br />REPLACEMENT AND SANITARY SEWER BACKWATER <br />PREVENTION PROJECT <br />DATE: JULY 8, 2025 <br />PREPARED BY: TYLER TROJAN, CIVIL ENGINEER III <br />PRESENTED BY: KURT KOWAR, PUBLIC WORKS DEPARTMENT <br />SUMMARY: <br />Staff recommends approval of the 2025 Water Main Replacement and Sanitary Sewer <br />Backwater Preventer Valve Project contract with Brannan Construction Company for the <br />base bid in the amount of $1,073,913 plus a 10% contingency in the amount of <br />$107,392. <br />BACKGROUND / PRIOR DISCUSSIONS: <br />Public Works performs annual replacements on the water distribution system to <br />proactively replace old and deteriorating pipes. Staff advertised the 2025 Water Main <br />Replacement and Sanitary Sewer Backwater Preventer Valve Project on April 23rd, and <br />April 30th, 2025. Bids were received on May 13th, 2025. Bids received are as follows: <br />Contractor <br />Base Bid <br />Brannan Construction <br />Company <br />$1,073,913.00 <br />Timberwolf Excavating <br />$1,526,475.00 <br />Bear Excavating <br />$1,198,590.00 <br />Northern Colorado <br />Constructors <br />$1,617,453.25 <br />SMH West <br />$1,855,573.00 <br />BT Construction <br />$1,931,650.00 <br />Staff recommends Brannan Construction Company as the lowest responsive bidder <br />based upon staff review of bid line items, adherence to bid requirements, and contractor <br />reference checks. <br />Please refer to the attached map for locations included with the base bid. <br />This year's water main replacement project will address undersized and outdated <br />infrastructure. The selected segments include some of the last remaining 4-inch <br />CITY COUNCIL COMMUNICATION <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.