My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2025-41
PORTAL
>
CITY COUNCIL RECORDS
>
RESOLUTIONS (45.160)
>
2025 Resolutions
>
Resolution 2025-41
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2025 3:13:44 PM
Creation date
8/1/2025 3:00:24 PM
Metadata
Fields
Template:
City Council Records
Also Known As (aka)
APPROVING AN AGREEMENT FOR THE 2025 MEDIAN LANDSCAPE RENOVATIONS PROJECT
Meeting Date
6/17/2025
Doc Type
Resolution
Signed Date
6/17/2025
Ord/Res - Year
2025
Ord/Res - Number
41
Supplemental fields
Expiration Date
9/15/2025
Parties Involved
BeGreen Landscapes LLC
Green Landscape Solutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARTICLE 5. CONTRACTOR'S REPRESENTATIONS <br />In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following <br />representations: <br />5.1 CONTRACTOR has examined and carefully studied the Contract Documents, (including the <br />Addenda listed in paragraph 6.8) and the other related data identified in the Bidding Documents <br />including "technical". <br />5.2 CONTRACTOR has inspected the site and become familiar with and is satisfied as to the <br />general, local and site conditions that may affect cost, progress, performance or furnishing of <br />the Work. <br />5.3 CONTRACTOR is familiar with and is satisfied as to all federal, state and local Laws and <br />Regulations that may affect cost, progress and furnishing of the Work. <br />5.4 CONTRACTOR has carefully studied all reports of exploration and tests of subsurface <br />conditions at or contiguous to the site and all drawings of physical conditions relating to surface <br />or subsurface structures at or contiguous to the site (Except Underground facilities) which have <br />been identified in the General Conditions as provided in paragraph 4.2.1 of the General <br />Conditions. CONTRACTOR accepts the determination set forth in paragraph 4.2 of the <br />General Conditions. CONTRACTOR acknowledges that such reports and drawings are not <br />Contract Documents and may not be complete for CONTRACTOR's purposes. <br />CONTRACTOR acknowledges that OWNER and PROJECT MANAGER do not assume <br />responsibility for the accuracy or completeness of information and data shown or indicated in <br />the Contract Documents with respect to such reports, drawings or to Underground Facilities at <br />or contiguous to the site. CONTRACTOR has conducted, obtained and carefully studied (or <br />assume responsibility for having done so) all necessary examinations, investigations, <br />explorations, tests, studies, and data concerning conditions (surface, subsurface and <br />Underground Facilities) at or contiguous to the site or otherwise which may affect cost, <br />progress, performance or furnishing of the Work or which relate to any aspect of the means, <br />methods, techniques, sequences and procedures of construction to be employed by <br />CONTRACTOR and safety precautions and programs incident thereto. CONTRACTOR does <br />not consider that any additional examinations, investigations, explorations, tests, studies or <br />data are necessary for the performance and furnishing of the Work at the Contract Price, within <br />the Contract Times and in accordance with the other terms and conditions of the Contract <br />Documents. <br />5.5 CONTRACTOR has reviewed and checked all information and data shown or indicated on the <br />Contract Documents with respect to existing Underground Facilities at or contiguous to the site <br />and assumes responsibility for the accurate location of said Underground Facilities. No <br />additional examinations, investigations, explorations, tests, reports, studies or similar <br />information or data in respect of said Underground Facilities are or will be required by <br />CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the <br />Contract Time and in accordance with the other terms and conditions of the Contract <br />Documents, including specifically the provisions of paragraph 4.3 of the General Conditions. <br />5.6 CONTRACTOR is aware of the general nature of work to be performed by OWNER and others <br />at the site that relates to the Work as indicated in the Contract Documents. <br />5.7 CONTRACTOR has correlated the information known to CONTRACTOR, information and <br />observations obtained from visits to the site, reports and drawings identified in the Contract <br />Documents and all additional examinations, investigations, explorations, tests studies and data <br />with the Contract Documents. <br />PROJECT: 2025 PHASE TWO MEDIAN LANDSCAPE RENOVATIONS <br />PROJECT NUMBER: 301313-630143 AGREEMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.