Laserfiche WebLink
Boulder County, CO <br />04099493 <br />Page 2 of 4 <br />EXISTING <br />EASEMENT <br />LOT 1 <br />SPApES <br />I I <br />SPACES <br />LOT 13, BLOCK 8 <br />COLORADO TECHNOLOGICAL CENTER, FIRST FILING <br />PLANNED UNIT DEVELOPMENT, 1ST AMENDMENT <br />LOT 12 <br />S89° 18' 19"E <br />370.00' <br />50 <br />SPAG <br />5 <br />4 <br />I(( <br />a 1° <br />TRAC,H <br />ENGOSURE SPACES <br />(q PREY OU SLY) <br />a <br />a <br />d <br />4 <br />O <br />ASPHALT DRIVE LANES EXISTING PARKING <br />AND PARKINS LOT <br />5~'AG <br />5 <br />96 SPACES <br />GONG. <br />DRAINAGE PAN <br />n <br />° 4 e 4 <br />d a d r, AG' 5 <br />I d <br />dd // <br />a 5 <br />S AGES <br />4DoGl< ARE, <br />°LoA1:21NO ) <br />GONGRETE <br />zi <br />44 <br />■ <br />:i <br />mIN <br />d C d <br />1SilrAG <br />G d <br />ES 2 HG <br />4 <br />- T <br />44 <br />r <br />4 <br />d4 <br />d4 <br />4 <br />• <br />d G d a <br />1 <br />I -GI 5/4" <br />I,241-5 <br />5/8" <br />(DISTANCE FRY, <br />BACK OF (' <br />PARKING <br />TO GATES NH <br />DIE---- <br />13 <br />ifT <br />P <br />24.1-0" <br />o a 4 <br />2 PARKING SPACES BEING <br />REMOVED FOR NEN TANK <br />SEE ENLARGED PLAN THIS SHEET <br />FOR DETAILED INFORMATION OF <br />NEW TANK AREA <br />EXISTING TWO <br />STORY BUILDING <br />31,430 S.F. <br />LOT 13, BLOCK 8 <br />4 <br />4 <br />• 4 <br />v <br />4 <br />a 4 <br />EXISTING <br />EASEMENT <br />5001-1 3/8" STONE <br />LANDSCAPE/RETAINING HALL <br />a <br />N89°45'20"W GONG. DRAINAGE SHALE <br />349.95' <br />4 4 a <br />d <br />4 <br />4.1 <br />4 <br />a4 <br />• <br />STONE! <br />DRA I N'GE <br />SHALE <br />I <br />1 <br />1 <br />I <br />1 <br />1 <br />1 <br />4 <br />r <br />7 <br />1 <br />►t <br />4 <br />4 <br />CHERRY STREET <br />Illlllp��,. _a011iii <br />T�10 iZTH <br />SITE PLAN <br />SG ALE : <br />I " _ 20'-0" <br />0' 10' 20' <br />40' <br />L <br />4 <br />S00°41'41"W <br />4° 1 <br />d <br />W <br />Z <br />W <br />CC <br />0 <br />>- <br />2 <br />0 <br />GONG. <br />SIDEWALK <br />EXISTING PARKING LOT <br />STRIPING <br />5' HIGH BOLLARDS (TYP. <br />FOR 6 <br />10' TALL METAL SCREEN <br />WALL (12'-0"x12'-0") <br />0 <br />10'x 10' GONG. PAD <br />EXISTING PARKING LOT <br />STRIPING (BEING <br />ELIMINATED) <br />4h <br />PARKING SPACE BEING <br />8'-0" 0ELIMINATED <br />1,500 GAL. TANK (5'-6" <br />'IA. x I6'-4" TALL) <br />N <br />f <br />EDGE OF —\ <br />EXISTING <br />BUILDING <br />AREA OF BUILDING <br />HOUSING EXISTING <br />EQUIPMENT SERVED <br />BY NEW TANK <br />6' HT. METAL <br />PERFORATED <br />SCREEN WALL <br />WITH 5' WIDE <br />ACCESS GATE <br />PARKING SPACE BEIN* <br />ELIMINATED <br />EXISTING CURB <br />ENLARGED TANK AREA PLAN <br />NO�T�—F SCALE: I/4-" = <br />0' 2' 4' <br />GENERAL NOTES: <br />1. WORK CONSISTS OF INSTALLATION OF NEW LIQUID NITROGEN <br />(LN2) TANK AND ASSOCIATED SCREEN WALL, PAD, AND PIPING <br />THROUGH THE ADJACENT BUILDING WALL. ALL NEW ITEMS <br />ARE NOTED IN ENLARGED PLAN ON THIS SHEET. <br />2. ALL OTHER ITEMS SHOWN ON THE DEVELOPMENT PLAN ARE <br />EXISTING TO REMAIN AS IS. <br />3. NO SITE LIGHTING, SITE UTILITIES, GRADING OR DRAINAGE IS <br />BEING CHANGED. <br />4. SEE SHEET PUD-1 FOR ALL LAND -USE DATA (SURFACE <br />COVERAGE AND PARKING BREAK -DOWN). <br />5. THE LOCATION OF THE TANK IS DRIVEN BY THE NEED TO <br />HAVE IT AS CLOSE AS FEASIBLE TO THE EXISTING EQUIPMENT <br />IT. THIS PROXIMITY IS CRITICAL DUE TO THE CHALLENGES OF <br />PIPING LIQUID NITROGEN LONG DISTANCES. THE EQUIPMENT IS <br />A T-VAC CHAMBER AND IT IS LOCATED IN A SPECIALTY LAB <br />ON THE SOUTHWEST CORNER OF THE BUILDING. <br />6. IN ADDITION TO THE NEW SCREEN WALL, THE AREA OF THE <br />NEW TANK IS ALSO SCREENED FROM CHERRY STREET BY <br />EXISTING MATURE LANDSCAPING. <br />7. EXISTING DEVELOPMENT PLAN INFORMATION TAKEN FROM <br />IMPROVEMENT LOCATION CERTIFICATE DATED 02-11-2025 AND <br />PREPARED BY FLATIRONS, INC. LAND SURVEYORS. <br />8' <br />C <br />0) <br />0 <br />0 <br />Q. <br />c <br />2 C <br />L <br />e <br />cE <br />o • U <br />o 6 <br />c0 <br />0 <br />m <br />L <br />03 <br />-oo <br />0 <br />0 <br />0 <br />0 <br />Ph: (303) 443-5355 <br />a Space LN2 Tank <br />cu <br />cu <br />U <br />s <br />u <br />a) <br />0 <br />0 <br />0 0 <br />U <br />a <br />1l= <br />PROJ NO: 23-13 <br />DATE: APRIL 14, 2025 <br />REV: JULY 28, 2025 <br />Copyright ©2025 - All rights <br />reserved RVP Architecture and <br />Consulting, P.C. All design <br />drawings and written material <br />herein may not be used or <br />duplicated without the written <br />consent of RVP Architecture and <br />Consulting, P.C. <br />SITE PLAN <br />PUD-2 <br />SHEET 2 OF 4 <br />