My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado Technological Center Filing 1 Lot 9 Block 1 Red Gold Bottling PUD Amendment 1
PORTAL
>
RECORDED PLATS (Mylars) and CITY MAPS
>
PUD (Planned Unit Developments)
>
C
>
CTC Filing 1 Block 1
>
Colorado Technological Center Filing 1 Lot 9 Block 1 Red Gold Bottling PUD Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2025 9:19:52 AM
Creation date
10/6/2025 2:53:29 PM
Metadata
Fields
Template:
CITYWIDE
Also Known As (aka)
Red Gold Bottling Corporation
Doc Type
Mylar
Ord/Res - Year
2025
Ord/Res - Number
33
Recordation Number
4104510
Subdivision Name
Colorado Technological Center Filing 1
Signed Date
5/20/2025
Parties Involved
The Beck Group
Cross-Reference
Red Gold Bottling Corporation
Record Series Code
40.180
Record Series Name
Maps Drawings Plats Plans
Quality Check
10/6/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Boulder County, CO <br />04104510 <br />Page 8 of 13 <br />c') <br />a <br />III <br />III <br />III <br />22.37" <br />III <br />III <br />BENCH DETAIL <br />SCALE: 1/2" =11-0" <br />MANU: ANOVA <br />MODEL: 6' TANDOM CONTOUR BENCH <br />SIZE: 6' LENGTH <br />SEAT & FRONT BACK: GRAY <br />REAR BACK: GRAY <br />FRAME: GRAY <br />III — <br />SURFACE MOUNT <br />PER MANUFACTURER <br />RECOMMENDATIONS <br />CONCRETE PAVING <br />CV <br />RED GOLD BOTTLING CORPORATION PLANNED <br />UNIT DEVELOPMENT, 1ST AMENDMENT <br />LOT 9, BLOCK 1, COLORADO TECHNOLOGICAL CENTER, FIRST FILING, <br />CITY OF LOUISVILLE, COUNTY OF BOULDER, STATE OF COLORADO. <br />CASE # PUD-000519-2024 <br />MADRAX U RACK, MODEL U238-SF-P <br />MATERIAL: POWDERCOATED STEEL <br />COLOR: PLATINUM <br />2.375" 0.D. STEEL 22" LONG <br />4" X 8" WEDGE ANCHOR WITH TAMPER <br />RESISTANT SECURITY NUT OR <br />STAINLESS STEEL MUSHROOM HEAD, $" <br />X 3" "SPIKE" #5550 AS MANUFACTURED <br />BY RAWL. <br />II II II II III II(- III III <br />COMPACTED SUBGRADE <br />1 1 11 1 11 1 11 1 11 1 11 1 11 1 11 1 1 <br />h— <br />3/8" X 6" CIRCULAR BASE PLATE <br />NOTES: <br />1. BASE PLATE SHALL BE MOUNTED TO CONCRETE VIA EXPANSION <br />ANCHOR: 4" X $" WEDGE ANCHOR W/ TAMPER RESISTANT SECURITY <br />NUT OR STAINLESS STEEL MUSHROOM HEAD, $" X 3" "SPIKE" #5550 <br />AS MANUFACTURED BY RAWL. <br />2. RACK SHALL BE SET FIRM AND ALIGNED WITH A TOLERANCE PLUS <br />OR MINUS 4" FROM PLUMB. <br />3. STEEL SHIMS SHALL BE INSTALLED PRIOR TO ANCHORING IN <br />PLACE WHEN NEEDED. <br />r3 BIKE RACK DETAIL <br />SCALE: 1/2" =11-0" <br />00 <br />CO <br />M <br />c) <br />r ter, r� r <br />a d <br />III <br />MANU: ANOVA <br />MODEL: METRIX TRASH <br />RECEPTACLE <br />SIZE:40 GALLON <br />COLOR: SILVER <br />SURFACE MOUNT <br />PER MANUFACTURER <br />RECOMMENDATIONS <br />4 <br />CONCRETE PAVING, <br />RE: DTL. 1 / - OR EXISTING <br />CONCRETE <br />4� TRASH RECEPTACLE DETAIL <br />8� SCALE: 314" =1'-0" <br />■ <br />=11E111E1 I 1 = Undisturbed subgrade =1 I�I I 1=111E111E <br />I =111=1 U=I 11=i=11 1=I 1-1 i 1� �111=1 ILH 11 111 <br />1=III= 11 b 11=11 I I=11 11=III=111=11 I=11 I I=11 b 11= -111=1 <br />III=11 111=111=III 11 =11, 1=11 -III I I =1 I I 11 -III I I III=111=111J I 111 i <br />1111111I 1I IT I I 1 III 1-11I II IT III I I lulu I' <br />1 //////%- <br />II- I- .. <br />111 - 1111- H- =- =-= <br />11-I1=111iiii_i� ,, - - I- =1= <br />H 111=111-111-111-1 1=11=1 11 ii H 1=11 HI 1- 11=111= <br />=III11 <br />1I11I <br />2X Root Ball Diameter <br />3-4 x Root Ball Diameter or outside transition zone <br />Prune only broken, dead wood, and co -dominant leaders from canopy per <br />industry best management practices <br />if needed 12" nylon tree strap with grommets on guy wire placed horizontally over <br />lateral branch or intertwine to prevent slippage Do not twist straps tight around trunk <br />if needed 1/2" diameter white PVC pipe section on entire length of each wire <br />if needed 14-Gauge galvanized wire, double strand Leave 1" to 2" slack in wire to <br />allow for trunk movement <br />if needed, 6' steel post or wood stake with safety caps per specification Set one <br />post to windward side and other opposite Install posts to 2' depth in undisturbed <br />subgrade Other staking methods as approved <br />Deciduous Tree Fall Planting' Wrap trunk to first branch with specified tree wrap material <br />Secure wrap at top with electrical tape; do not attach tape to bark Do not wrap rough <br />bark trees Remove trunk wrap in spring after last frost <br />Open top of burlap and carefully remove soil from top of root ball to expose root flare to <br />top of first order roots Set top of root flare/first order roots at or 1" to 2" above finish <br />grade Trees planted without the root flare visible will be rejected Prune adventitious <br />roots on trunk <br />Circle of shredded wood mulch, 3" deep and 4" to 6" away from trunk, 8' diameter <br />or to outer edge of planting hole, whichever is greater <br />Form 2" high soil saucer around planting hole at outside of transition zone <br />- Finish Grade <br />Native soil or amended per soil test recommendations <br />Slope sides of planting hole, scarify and roughen sides prior to installing tree <br />Prior to placing root ball in planting hole, remove all twine and bottom 1/4 of <br />wire basket Carefully place root ball into planting hole, set in final location, <br />then remove remaining wire Cut and gently remove min 2/3 of burlap from top <br />and sides of root ball Prune circling or girdling roots at and on outside of root <br />ball to perpendicular angle from trunk Remove debris from planting hole <br />Any broken, crumbling, or otherwise damaged rootball shall not be planted <br />TREE PLANTING DETAIL <br />8 <br />SCALE: NTS <br />2X ROOTBALL <br />DIA. MIN. <br />REMOVE ONLY INJURED OR DEAD <br />BRANCHES FROM SHRUBS. SHRUB <br />SPACING AS PER PLANS, LAYOUT <br />VARIES. <br />PLACE 3' DIA. MIN. RING OF MULCH <br />UNDER SHRUB <br />REMOVE CONTAINER OR <br />COMPLETELY /PEEL BACK, CUT <br />AND REMOVE 1/3rd OF THE <br />BURLAP. REMOVE ALL ROPE, <br />TWINE AND WIRE. SET ROOTBALL <br />PLUMB IN CENTER OF PIT WITH <br />TOP OF ROOTBALL 2" ABOVE <br />FINISH GRADE. BANK SOIL TO TOP <br />OF THE ROOTBALL. <br />REMOVE DISH WHEN READY TO <br />SOD OR SEED, CONDITION VARIES. <br />PREPARE AND PLACE PLANTING <br />SOIL MIX AS PER SPEC. <br />SET ROOTBALL ON UNDISTURBED <br />SUBGRADE <br />COMPACTED SUBGRADE <br />(2 SHRUB PLANTING DETAIL <br />SCALE: 112" =1'-0" <br />CURRENT SUBMISSION: PUD AMENDMENT RESUB. #2 <br /># DATE SUBMISSION <br />C 12/20/24 PUD AMENDMENT RESUB. #1 <br />D 03/20/25 PUD AMENDMENT RESUB. #2 <br />BECK ARCHITECTURE, LLC <br />1001 17TH STREET <br />SUITE PL100 <br />DENVER, CO 80202 <br />PH: (303) 466-9665 <br />WWW.BECKGROUP.COM <br />LANDSCAPE DETAILS <br />8 <br />8 OF 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.