Laserfiche WebLink
<br /> C. Notwithstanding the above, floods from runoff may occur that exceed the capacity of <br /> storm water facilities constructed and maintained by funds made available pursuant to this chapter. <br /> This chapter does not imply that property subject to the fees and charges established herein will be <br /> free from storm water flooding or flood damage. This chapter shall not create or imply any liability <br /> on the part of the City or any officer or employee thereof for any flood damage. Further, this chapter <br /> does not purport to reduce the need for any property owner to obtain flood insurance. <br /> Sec. 13.37.020. Definitions. <br /> For the purposes of this chapter, the following words and terms shall be defined as follows, unless <br /> the context in which they are used clearly indicates otherwise: <br /> Base Rate means the monthly rate of assessment associated with each runoff area unit (RAU) <br /> calculated for a property. <br /> Director means the Director of Public Works of the City of Louisville or such person's <br /> designee. <br /> Development means any man-made change to real property including, but not limited to, <br /> buildings or other structures, streets, parking lots, mining, dredging, filling, grading, paving, or <br /> excavating. <br /> Impervious Surface means surfaces on or in real property where the rate of infiltration of <br /> stormwater into the earth has been reduced by the works of man. For purposes of this chapter, <br /> buildings, man-made structures, driveways, patio areas, roofs, concrete or asphalt sidewalks, parking <br /> lots or storage areas, and other bricked, oiled, macadam or hard-surfaced areas which impede <br /> passage of stormwater into the earth's surface are deemed to be impervious. <br /> Person means an individual, corporation, limited liability company, governmental agency, <br /> business trust, estate, trust, partnership, association, two (2) or more persons having a joint or <br /> common interest, or any other entity. <br /> Project Costs means all costs of administration, coordination, management, design, planning, <br /> engineering, construction, reconstruction, installation, repair, replacement, improvement, and <br /> operation and maintenance of stormwater facilities, including but not limited to those costs to <br /> comply with federal, state or City laws regulating stormwater facilities or runoff, and also including <br /> but not limited to associated costs for acquisition of rights-of-way and other interests in land for <br /> stormwater facilities, contingencies, financing, legal, accounting and other professional services. <br /> Runoff means that part of snowfall, rainfall or other stormwater that is not absorbed, <br /> transpired, evaporated, or left in surface depressions, and that then flows controlled or uncontrolled <br /> into a street, storm sewer, watercourse or body of water. <br /> Runoff Area Unit (RAU) means the average area of impervious surface on a single-family <br /> - 2- <br />