My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2011-34
PORTAL
>
CITY COUNCIL RECORDS
>
RESOLUTIONS (45.160)
>
2010-2019 Resolutions
>
2011 Resolutions
>
Resolution 2011-34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 10:19:54 AM
Creation date
7/7/2011 11:46:10 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Resolution
Signed Date
6/28/2011
Ord/Res - Year
2011
Ord/Res - Number
34
Original Hardcopy Storage
7D5
Supplemental fields
Test
RES 2011-34
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
extend from approximately Main Street to CITY's jurisdictional limits east of Highway 42, <br />as shown on Exhibit A. PROJECT shall also include the new dual 30-inch culvert crossing <br />at Highway 42 north of Drainageway A -2, as shown in PLAN. <br />B. Right -of -Way Delineation and Acquisition. Right -of -way for the improvements as set forth <br />in the final design and an estimate of costs for acquisition shall be determined. Maps, parcel <br />descriptions and parcel plats shall also be prepared. <br />C. Construction. PROJECT shall include construction by DISTRICT of the drainage and flood <br />control improvements as set forth in the final design and vegetation establishment. <br />3. PUBLIC NECESSITY <br />PARTIES agree that the work performed pursuant to this Agreement is necessary for the health, <br />safety, comfort, convenience, and welfare of all the people of the State, and is of particular benefit <br />to the inhabitants of DISTRICT and the property therein. <br />4. PROJECT COSTS AND ALLOCATION OF COSTS <br />A. PARTIES agree that for the purposes of this Agreement PROJECT costs shall consist of and <br />be limited to the following: <br />1. Final design services; <br />2. Delineation, description and acquisition of required rights -of -way /easements; <br />3. Construction of improvements; <br />4. Contingencies mutually agreeable to PARTIES. <br />B. It is understood that PROJECT costs as defined above are not to exceed $300,000 without <br />amendment to this Agreement. <br />PROJECT costs for the various elements of the effort are estimated as follows: <br />ITEM AMOUNT <br />1. Final Design $200,000 <br />2. Right -of -way 50,000 <br />3. Construction -0- <br />4. Contingency 50,000 <br />Grand Total .$300,000 <br />This breakdown of costs is for estimating purposes only. Costs may vary between the <br />various elements of the effort without amendment to this Agreement provided the total <br />expenditures do not exceed the maximum contribution by all PARTIES plus accrued <br />interest. <br />1dcm\agrmnt \11 \110403 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.