Laserfiche WebLink
representatives of the Local Agency, which expressly authorizes die Local Amy to entd-hunthis contract. and to <br />conTlete the. Project A copy o rthis ordinance or resolution is attached hereto and •ind,aportiled herein as Exhibit! B. <br />9 This contract is executed under the authority of* 29-1-203, 43-1- 10; 13-1-1 1.6..43-2-101(4)(0 and 45,2444; <br />S, and Exhibit B, <br />0, The Local Agency isl...idetritinely staffed and suitably &A nipped to undenake and satisfactorily complete [he Projw. <br />1 L Ile 1al Agency am more advantagctouslyperferrn the servidliS hi complete the Project, <br />THE PARTIES,NOW AGREE AT: <br />&cthn 1—Seope,tif Work <br />"ate Colorado 'Department of 'Hansportut ion (0)01) will provide project oversight 10 die City of Leinsvilie <br />(C1-1*Y) when CITY develops tmegnited infrastructure plans ibr implementation on two projects: the Louisville Station <br />Area Next Steps Implementation Plan and the Highway 42 Con-idor Plan from Lock Street to Paschal Drive, The <br />Louisville Starien. Area Net Steps projed will create a .multi-modal cormixtion hi the proposed CO D station While <br />providing regiOnal eonnettn between the ,43oodue, Ditch Trail and the Coal, Creek 1Mi 1, while also it nproving the <br />pedestrian Count-diens for the RTD Station Arelit, "Flie HighWily 42 project will emit ountext sensitive multimodai <br />corridor. Ibis work may contain the following features: infrastructure ihipiementation plans., pedestrian connixtions <br />and facilities, streit crossings; mad way and intersection improvements, <br />CDOT Funciiiv Ad vaned tent for Surface Transportation &EconomteRceovety (1ASTER) Rinds have hew <br />awarded to this project; as well as Federitl,Boul der County, and City off nusviJIc Funds. CDOTand CITY believed <br />will be beneficial to perforin this work b=use the Louisville FasTracksStat ion and the Highway 42 Corridor will <br />enhance in nodal transportation ou a City and regional level, <br />Tis work will (--onibmi to the American with Disabilities Act and build on past crry Planning work such aS <br />the Highway 42 Revitalization Plan, thCMixrx.1 Use Development Design Standards raid Guidelines, the Highway 42 <br />Access Study, Arai the Downtown Parking and Pedestrian Action Plan. The implonentation plan and design will be <br />tbnded with FASTER funds and will result in 30%,,schernat ire design plans for theprefeited redimmendation. The <br />construction phase isphinne for 2014 and is anficipatul to take twelve (12) months_ <br />Section 2. Order of Pr-ecctlertee <br />in the c(4.111 of conflicts or inconsistencies between this contract and its exhibits, such ix <br />incotencics shall be resolved .by reference to the documents in the following order of priority: <br />1. Special Provisions enntaihed in See:6CM 28 of this ecininotet <br />2 This contract <br />3, Exhibit A. (Scope cit- Work) <br />4,.. Exhibit C (Funding Provisions) <br />Exhibit 1') (Option Letter) <br />6, Exhibit E (DUE .liequirtments) <br />7, Other Exhibits in descending order or their attachment. <br />2 <br />218 <br />WctS <br />