Wood stated that with regards to the Site Plan, the proposed building is a 4,250 square <br />foot commercial building. The building as proposed is to be built up to its front and side <br />property lines. As the property is in the Core design area, no front or side setbacks are <br />required. The building is set back 60 feet from the rear property line (RR right-of-way) <br />to allow for a parking lot. There isn't any alley or access easement that currently exists. <br /> <br />Wood stated that the building was reviewed by the Historical Commission and does meet <br />building requirements. The Historical Commission felt that it was a good transition from <br />the residential looking building to a fully commercial building. <br /> <br />With regard to parking, Wood stated the application does meet the parking requirement <br />of 2.5 spaces per 1,000 square feet. There are a total of ten parking spaces provided for <br />700 Front. The existing building at 700 Front Street would actually be grandfathered <br />from meeting the downtown parking ordinance. There are a total of 17 parking spaces. <br />The 4,250 square feet proposed will reduce the total allowable building area to 354,00 <br />square feet on the west side of the RR tracks in downtown. <br /> <br />Wood noted that the primary issue in the site plan is access. He stated that there are two <br />options. Option 1 represents the shared access across the 700 Front Street property with <br />direct access to Pine Street. Option 2 proposes access from the RR right-of-way and does <br />not have access to Pine Street. Currently there is no access authorized through the RR <br />right-of-way. Wood stated that neither option is ideal, and this PUD has a number of <br />constraints and limitations. There is no ideal parking plan that addresses all the needs of <br />this property and the safety concerns. The design handbook does not allow direct access <br />onto Front Street. Option 1 would allow direct access right-in/right-out access on to Pine <br />Street, providing a shared parking area requirement. Option 2 provides for no access on <br />Pine Street, and proposes access from the RR right-of-way. <br /> <br />Wood noted that Mark Wojciechowski has not had any success in communicating with <br />the railroad relative to obtaining a right-of-way. Staff has met with the business owners <br />and they have requested that the City pursue right-of-way with the railroad. The right-of- <br />way would allow them to have parking and continue to have service delivery to the rear <br />of the buildings. <br /> <br />Wood noted the Option 2-site plan assumes that the City could obtain right-of-way from <br />the railroad. The Planning Commission has forwarded conditions that would allow <br />additional time to negotiate right-of-way with the railroad. He stated that there were a <br />number of scenarios, and the Planning Commission has approved the plan with four <br />conditions, which are as follows: <br />1. That an ALTA (or equivalent) survey be provided to verify property boundaries prior <br /> to building permit issuance; <br />2. That the Option 2 site plan be implemented, unless the City is unable to obtain the <br /> necessary access easement or alley right-of-way by July 31, 2000 or prior to issuance <br /> of a building permit, whichever occurs later; <br /> <br />20 <br /> <br /> <br />