Laserfiche WebLink
• • -. <br />• • <br />S. Boulder Road° <br />• <br />• <br />• <br />Griffith Street <br />c <br />tr <br />1 . . <br />• <br />Improving Access to the North Portion <br />of the Revitalization Area is a Priority. <br />Hwy. 42 Revitalization Area <br />Step 1: Get the Ball Rolling <br />Staff, working with CDOT, has gained <br />conceptual approval for a signal on Hwy. 42 near <br />Cannon Cir. <br />