Laserfiche WebLink
Remove temporary walls. <br />Clean up basement floor. <br />Reinstall walls, paneling and stairs if existing material is usable. If not order <br />new material and install. <br />Paint new walls and stairs or touch up existing materials. <br />Reinstall carpet and windows <br />Reinstall ductwork, furnace and reconnect. <br />Attic above house <br />Core drill (2 " -3 ") over rafters and install Timberloks from top of rafter to <br />top plate at each rafter. Cover each hole with felt paper to dry -in. <br />Inspect timberloks. <br />Remove old layers of asphalt roofing and remove from site. <br />Install new 15/32" sheathing on house, front porch and back porch. <br />Dry -in house. <br />Install new asphalt roofing material. <br />Install new gutter if necessary. <br />Repair stucco after installing new flashing required by newer codes. <br />Complete framing in attic over house. Add webs, plate, metal connectors, <br />LVL sister framing. Jack up rafters as called out spec's. <br />Front and back porch <br />Remove material around porch beam and verify structural integrity. <br />Add 1 -7 1/4" LVL at front porch, north and south ends. <br />Remove finish material at ceiling above front porch. <br />Remove lower 1 x skip sheathing. <br />Install new continuous dropped beams. Install cross beams and supports for <br />rafters. <br />Inspect framing work. <br />Reframe ceiling supports and install new plywood ceiling finish. Reinstall <br />beam wrap material. <br />Patch stucco at top of beam posts at front porch. <br />Paint porch ceiling, bottom side of lx skip sheathing and beam wrap. <br />Install new beams and supports above back porch. <br />Inspect all attic work. <br />Blow in new ceiling insulation. <br />