Laserfiche WebLink
Hoffinan Job Procedure List <br />Test for asbestos <br />Order portable toilet <br />Order trash dumpster <br />Basement <br />Remove duct under beam w/ asbestos joint compound and <br />remove insulation in attic - asbestos abatement company <br />Remove all personal belongings in basement, including in crawl space - by <br />owner <br />Remove carpet on one side of basement and store off site <br />Disconnect furnace and move to south side of basement <br />Remove windows in basement and install temporary covers <br />Remove a portion of shelves and doors at each crawl space to access both <br />crawl spaces. Save material if possible to reinstall after work is complete. <br />Remove walls and paneling under and around beam and at stairs. <br />Remove stairs and store on site. <br />Install temporary walls on each side of beam to support floor. <br />Remove existing metal and wood posts. <br />Cut concrete floor, remove concrete and soil for new footing pads. <br />Hopefully no unintended obstructions or problems will be found under <br />floor. (Plumbing or water) <br />Inspect footing pads. <br />Pour footing pads. <br />Items in italics - Is this necessary? Why add footings to this wall? <br />Remove plastic in crawl space. <br />Excavate and check footing in crawl space. <br />Form new footings if necessary. <br />Inspect new footings. <br />Pour new footings. <br />Spread excavated soil in crawl space. <br />Install new plastic in crawl space and adhere to foundation wall. Replace <br />insulation if necessary. <br />Replace cabinet shelves and doors. <br />Install new metal posts. <br />Pour concrete flush with floor around new posts. <br />