Laserfiche WebLink
<br />Planning Commission <br />Meeting Minutes <br />JUNE 14, 2007 <br />Page 9 of 13 <br /> <br />development for 66,776 SF building to be built in phases and to be located on the <br /> <br />westerly 4.89 acres of a 6.60 acre parcel. Case #07-009-PS/PP. <br />. Applicant and Representative: Etkin Johnson Group (Jim Vasbinder) <br />. Owner: The O'Connor Group (Chris Rebich) <br />. Case Manger: Sean McCartney, Principal Planner and Paul Wood, Planning Director <br /> <br />Conflict ofInterest and Disclosure: <br />None heard. <br /> <br />Public Notice Verification: <br />Published in the Daily Camera on May 27,2007. Posted in City Hall, Public Library, Recreation <br />Center and the Courts and Police Building and mailed to surrounding property owners on May <br />25, 2007. <br /> <br />Staff Report of Facts and Issues: <br />Wood provided the following summary: <br />. The request is for a preliminary subdivision plat and PUD development plan for CTC <br />Filing NO.3 which is located adjacent to and south of Cherry Street, approximately <br />750 feet west of South 104th, also known as 1900 Cherry Street, and is 4.84 acres in <br />SIze. <br />. The subdivision plat is for a two lot subdivision. Lot 1 proposes a phased flex <br />building and Lot 2 is designated for a water quality storm detention facility. <br />. The parcel is required to dedicate 12% of the land area (exclusive of ROW) or pay a <br />cash-in-lieu payment. Staff is recommending the applicant meet the requirement <br />through a cash-in-lieu payment and the payment amount to be based on the appraised <br />value of the land prior to issuance of a building permit. <br />. The preliminary PUD proposes a phased building: 40,413 SF in phase 1 and <br />expansion in phase 2 to 66,776 SF. <br />. The proposed building, in either phase configuration, does allow full vehicular and <br />emergency access to all sides of the building, as well as loading docks in the rear of <br />the building (located on the south side of the building). <br />. The applicant is requesting three (3) access points into Lot 1 where the IDDSG limits <br />the access points to two for a lot less than 5 acres in size. <br />. The Public Works Department is requesting an opportunity to either eliminate the <br />third access point or move it to the west. Staff recommends a condition of approval <br />which would allow the applicant to propose an alternate location for review by the <br />Public Works Department. <br />. The proposed development exceeds the minimum parking ratio as required by the <br />IDDSG. <br />. The building massing is reduced in scale in accordance with the IDDSG through <br />variations in color, step backs in the building footprint and variation in roof forms. <br />. An adjoining parcel to the south is zoned Agriculture which triggers a more extensive <br />landscape buffer between the two parcels. The applicant is requesting relief from the <br />required 25' width to avoid technical conflicts with a required utility easement that is <br />located adjacent to and runs parallel with the south property line. In addition, the <br />applicant is being asked to maintain a minimum width of24' for the adjoining access <br />drive. The applicant proposes to install a 17' to 22' wide landscape buffer along the <br />entire length of the southerly property line. Staff recommends support of the <br />