Laserfiche WebLink
Louisville 42 Gateway Project <br />Table 1: LRC SWOT Analysis Results <br />Strengths Weaknesses <br />Positive internal factors and views held by the Negative internal factors and views held by the <br />LRC that further or support the project LRC that could hinder the project <br /> The City sees a lot of ‘wallets’ and economic There is not a real focus on exactly what the City <br />opportunity for those travelling on 42 to spend wants; need to define a clear project objective and <br />money in Louisville develop consensus <br /> Established land use from previous plans The users of Highway 42/residents don’t have a high <br />level of acceptance for low level of service (LOS) <br /> When people are at the baseball fields, the amount <br />of traffic is less on Highway 42 People travelling along the corridor don’t care about <br />Louisville; they want to move through <br /> CDOT, City, BOCO all have the same requirement <br />that all modes of transportation need to be City cannot raise the level of expectation to a level <br />accounted for that they can’t deliver on <br /> Highway 42 does not compete with the main street; Lack of funding and budget <br />there is not pressure to design it like one because <br /> Peoples current orientation is north/south not <br />Louisville already has one <br />east/west <br /> The process and opportunities for discussion <br /> The pedestrian challenge is to get people from the <br /> Natural proximity of the Highway to Old Town – use east side of 42 to the west side of the Highway <br />redevelopment as a way to signal what Louisville is <br /> Proximity of drainage swale <br />about <br /> Multi-jurisdictional open space <br /> Highway serves as a gateway to advertise <br /> Limited right-of-way <br />downtown and attract more visitors <br /> Currently unsafe corridor <br /> Willingness of, and ability to partner with, <br /> Recent 4 lane construction at South Boulder Road <br />landowners along the highway <br /> Speed limit and design speed do not match <br /> The land on east side is open space, so the west <br />side has the opportunity to attract the commercial <br />attention of the corridor <br /> A staff with great technical expertise, and a <br />willingness to explore new ideas <br />Opportunities Threats <br />Positive external factors outside of the LRC’s Negative external factors outside of the LRC’s <br />control that further the project control that hinder the project <br /> Opportunity to focus on infrastructure as a means to Narrow travel lanes and certain designs may not <br />support private-sector development through a new pass the litmus test developed for roadway <br />gateway into town development in the City <br /> The potential connection of the light rail station and There are conflicting objectives between the County <br />bus station to downtown and CDOT and the City doesn’t have much to affect <br />the design outcome of the road <br /> Opportunity to tie the east side of the tracks and ball <br />fields to the rest of the community Public awareness of the project <br /> If the train is coming, bus traffic and awareness of There is a community perception that pedestrians <br />Louisville will increase are a greater priority than automobiles <br /> Once the northern land uses fill in pedestrian access The introduction of buses can slow traffic <br />along Highway 42 will be needed <br /> Working with CDOT on congestion tradeoff <br /> The City wants this to be pedestrian and multi-modal <br /> Fiscally constrained project <br />and feels that CDOT wants the same; this project <br /> Disagreement on what can/should be the goal <br />will be a discussion of details <br /> Balancing capacity with all modes <br /> Opportunity to match the Highway design speed to <br /> Too much focus on other users of Highway 42, and <br />the posted speed and create friction that draws <br />not the Louisville residents <br />people into Louisville <br /> Lack of access to capital, if no one is looking to <br /> If there is consensus and clear definition of the <br />redevelop right now <br />project, the money can be sought after <br /> Possible soft surface trail on the east side of <br />Highway 42 <br /> Increase multi-modal travel and pedestrian friendly <br />environment <br />3 <br />