Laserfiche WebLink
Northwest Rail Update (cont.) <br />Themajor scope changes between previous and current <br />• <br />estimates include the following: <br />–Increased need for corridor rights-of-way <br />–Increased cost for environmental mitigation and utility <br />relocations due to larger right-of-way needs <br />–Additional vehicles needed to meet BNSF requirements <br />–Upfront BNSF cost for operating time slots in perpetuity <br />9 <br />6 <br />