Laserfiche WebLink
• <br />02/01/2000 17:14 . CHARLES KEIM AND ASSOCIATES 4 3036049560 <br />Charles Kelm & Associates <br />Consulting Engineers <br />NO.195 002 <br />PRELIMINARY COST PROJECTION <br />CKA <br />.JOB # 99-405 <br />Louisville Arboretum Parking Lot <br />TOTAL <br />ITEM. DESCRIPTION <br />UNIT <br />QUANTITY <br />UNIT PRICE <br />TOTAL <br />EARTHWORK <br />EW 1 CLEARING, GRUBBING, AND STRIPPING <br />ACRE <br />0.5 <br />$ 800.00 <br />3 400.00 <br />EW 2 EXCAVATION <br />CU YD <br />140 <br />$ 4.00 <br />$ 560.00 <br />EW 3 IEMBANKMENT <br />CU YD <br />1716 <br />I-- <br />EW 4 1) EXISTING ON -SITE FILL <br />CU YD1 250. <br />$ ' 4.00 <br />$ 1,000.00 <br />EW 5 2) OVERHAUL (FILL BROUGHT IN) <br />CU YO <br />1466 <br />S 6.00 <br />$ 8,796.00 <br />EW 6 EROSION CONTROL DURING CONSTRUCTION <br />LS <br />1 <br />$ 2,500.00 <br />S 2,500.00 <br />EW 7 REVEGETATION <br />SQ FT <br />13970 <br />BY PARKS DEPARTMENT <br />_ <br />SUBTOTAL • EARTHWORK �^ ^� <br />$ 13,256 <br />PAVING <br />P 1 CURB CUT NEW CURB RETURN <br />LS <br />1 <br />$ 4,100.00 <br />$ 4,100.00 <br />P 2 SUBGRADE PREP <br />SQ YD <br />892 <br />$ 1.26 <br />$ 1,115.00 <br />P 3 6" GRAVEL <br />SQ YD <br />892 <br />$ 9.00 <br />$ 8,025.00 <br />_ <br />P 4 SIGNS <br />EA 2 <br />$ 200.00 <br />$ 400.00 <br />P 5 TRAFFIC CONTROL <br />LS 1 <br />$ 1,500.00 <br />$ 1,500.00 <br />SUBTOTAL - PAVING <br />$ 15,143 <br />DRAINAGE <br />0 1 18" RCP <br />LF. <br />35, <br />$ 38.00 <br />_ <br />$ 1,330.00 <br />D 2 COOT TYPE C INLET (2' DEEP) <br />EA <br />1 <br />$ 4,500.00 <br />$ 4,500.00 <br />D 3 113° FLARED END SECTION <br />EA <br />1 <br />$ 800.00 <br />$ 40.00 <br />$ 800.00 _ ___ <br />$ 3,000.00 <br />0 4 RIPRAP (BURIED) _ <br />Cy <br />75 <br />• SUBTOTAL- DRAINAGE <br />$ 9,630 <br />MISCELLANEOUS . <br />M 1 RELOCATE IRRIGATION BOX <br />LS 1 <br />$ 700.00 <br />$ 700.00 <br />M 2 REMOVE - 5 LF OF FENCE - <br />LS <br />1 , <br />$ 200.00 <br />$ 200.00 <br />(SUBTOTAL - MISCELLANEOUS <br />$ 900 <br />TOTAL CONSTRUCTION COST <br />S 38,929 <br />20% CONTINGENCY COST <br />— <br />$ 7,786 <br />GRAND TOTAL <br />1$ 46,715 <br />g: /projects/99 /405 /costestimate <br />Page 1 <br />revised Feb 2, 2000 <br />PRINTED 2/2/00 <br />