Laserfiche WebLink
L u sv e Revitalization Comnnisslon <br />Blight Conditions 0Scsn'itvori Soo C`rejert <br />Project Marne: par) 1 Cdre Project Area <br />Please provide a short description of how I,ne pr0lert acoresseii the tattcswelg 4'3109'r4 c,;,rroit,ons <br />idet7ttfiect in the Urban Renewal Area. <br />�T—I All deteriorating structures will he repaired cr replaced will] <br />nta v buildings that will conform. to rite latest be4rtng Dote <br />I and designs within existing City criteria. DELO i5 currently_ <br />I I+ivaitrgatrng the possible imetementattee of LEED and or <br />"green" based buiidinpractices 1 <br />The existing. pulatl stre-ets that.a are wiinin the Core Project <br />j Area and adjacent to DELO are in a state of disrepair. In fact, <br />Canoe, heed and L.aiayette Street are not even paved in most <br />areas and are tittered with potholes and are lies -ate for both <br />pec stri n and vehicular use _ — <br />The current large Industrial Tots (which do not allow for <br />neighborhood connectivity) will be re -platted into smaller Tots <br />adjacent to new streets and sidewalks based on new <br />urbanism land_ planni oncepts. <br />The existing deteriorated buildings: utilay IJstes. and streets <br />Will D.e replaced or repaired_ to standards that incorporate new <br />erbar;isrri best practices. The eatisiisag street Crib withie the <br />Core Project Area is dilapidated, in disrepair, and does not <br />accommodate .tide pedestrian access. Upon acquisition of the <br />old Aggregate} Ficre1e batch plant., DELO immediately <br />reree.cisaittl 'iti- e''ri concrete manufacturing facilities There <br />u; spas r ,occurring at might with nefarious aetivities <br />c • ; lrirvklrry and graffiti. Large areas do not have <br />street Irgliting to maintain Public safety ctuoieg the. <br />nli l^et npurs. _ _ --_- _ — —I <br />The Urban Renewal Authority and the City ca# Lou,stirithss has <br />deemed the. Core Project Area and the underlying land <br />comprising DELO a bttghtect area. DELO. LLC is of the <br />opinion that this area of Louisville is the most deteriorated <br />srsctiue of the City and %s sn need of redevelopment. <br />grefereri a .rictures below <br />Tit e lss-ir outdated utilities will be improved to a level <br />adequate for new development. Aodrtionatfy, road networks <br />eeed to tie improved and extended through multiple <br />properties with underlying utilities unproved and extended to <br />survtee adjacent propertle within the Core Project Area. A, i <br />example of inadequate utilities is the 15' seeitatj sewer Chet ti3 <br />vitrified clay pipe (VCP). According to cornrtturttatians <br />between our general c:onver:tor red the Oty's Pubtrc Works <br />Oeparrlr = , hot and fast'. DELO, t LC intends o n <br />discustiv the \ICP vi,ith more modem PVC piping <br />while dal4:;, dining if any upsizing of the sewer line Would be <br />required to eor n tx ate recieveiopreerit within the Core <br />a) Skim. deteriorated, or <br />delenorabid streclures: <br />b) Frer3C�rtiirtence r rdefed iyi <br />nr Triad c ur�le s°1t•eet kdyuuL <br />cj F=atttty lot tay4 sir r431itro� <br />to size adequacy, <br />accessti4 yl4t car usofulinl ss; <br />tJ} Ur1sartitary or unsafe <br />eend4tt+ sas: <br />e) Deterioration or sole or other <br />tr 1proYernent.s; <br />Unusual topography or <br />inadequate public <br />improvements or utilities; jProject Area, - - - <br />