My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Minutes 2012 11 08
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2012 Planning Commission Agendas Packets Minutes
>
Planning Commission Minutes 2012 11 08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:55:21 AM
Creation date
1/31/2013 9:11:28 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
PCMIN 2012 11 08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning Commission <br />Meeting Minutes <br />November 8, 2012 <br />Page 3 of 12 <br /> <br />2. Church building is 24,644 SF <br />3. Seating for 240-260 <br />4. 198 parking spaces <br />5. Access onto Washington between Hawthorn and South Boulder <br />6. Unimproved baseball field <br />7. 29.5% lot coverage <br />Proposal <br /> <br /> <br />1. Add 83 parking spaces <br />2. Landscape the new parking lot <br />3. Construct a 1,800 SF picnic pavilion <br />4. Improve existing drainage <br />5. Relocate the access to be in line with Hawthorn Street <br />6. Remove existing baseball field with new landscaping <br />7. No expansion to the existing church <br />8. 40% lot coverage <br />Drainage <br /> <br /> <br />1. Currently served by two (2) detention ponds sized for 100-year storm; <br />a. One pond on the southeast corner <br />b. Other pond in the parking lot <br />c. Flows are not controlled. <br />2. Project will improve runoff release to Hawthorn Street: <br />a. Directed to a new sidewalk chase <br />b. Improvements to the pond in the parking lot <br />c. Improvements to the existing detention pond on the southeast <br />corner <br />Picnic Pavilion <br /> <br /> <br />Staff reviewed the five (5) criteria to the proposed project and believes the project <br />complies with all of the SRU criteria. <br />Staff recommends approval of Resolution No. 22, Series 2012, approval of a <br />Preliminary/Final Plat and special review use (SRU) amendment to allow for the <br />expansion of the existing parking lot and placement of a picnic pavilion in the <br />Agricultural (A) zone district, with one (1) condition: <br />1) The applicant shall extend the eastern sidewalk the entire length of the <br />property along the west side of Washington Avenue. <br />Commission Questions of Staff <br />Brauneis requested a basic review of drainage on hard surfaces. <br />Russ stated the applicant’s engineer would be better suited to address his questions <br />during their presentation. <br />Lipton discussed the fire code capacity, the number of parking spaces and drainage. <br />Russ stated the building was approved by the Fire District during the initial building. <br />He stated the 280 parking spaces should be adequate for a 300 person event. The <br />drainage concerns have been addressed by the applicants engineer and would be <br />best to answered during their presentation. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.