Laserfiche WebLink
platforms will be designed to hang 18 from the rail and 18 out this will <br />give 18 of buffer between the planter and the travel lane. <br />There was lengthy discussion about water and electrical hookups. <br />we are working on the design or these elements but they might no <br />design. Even though some were concerned, others understood it i <br />sure the design is right before we rush something out for this year. It was discussed th <br />final design should have the water and electrical tucked under t <br />seen. They also indicated that there are existing water spigots <br />the street in front of both the Empire and Waterloo. This may b <br />water for future incorporation into the patios. <br />They were primarily interested in making sure the patio designs <br />unveiling, Memorial Day is the latest they want the patios completed. <br />The last thing they mentioned was to possibly work with a local metallurgist known as Atomic <br />Forge out of Erie. They said they may be able to cut the City a <br />architectural railing and planters. We have forwarded this information to the ECI Site <br />Construction Management Inc. The contract for construction will be presented to Council on <br />February 5, 2013 for approval to ensure we can get the patios fa <br />