My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2013-09
PORTAL
>
CITY COUNCIL RECORDS
>
RESOLUTIONS (45.160)
>
2010-2019 Resolutions
>
2013 Resolutions
>
Resolution 2013-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2024 1:02:36 PM
Creation date
2/20/2013 7:43:11 AM
Metadata
Fields
Template:
City Council Records
Also Known As (aka)
IGA CDOT_Diverging Diamond Interchange 2013
Doc Type
Resolution
Signed Date
2/19/2013
Ord/Res - Year
2013
Ord/Res - Number
09
City Property Name
Infrastructure Streets
Project Name
Hwy 36 McCaslin Blvd Interchange Bridge
Cross-Reference
Diverging Diamond Interchange DDI
DDI, CIP - US 36 / MCCASLIN BLVD INTERCHANGE IMPROVEMENTS
Original Hardcopy Storage
7D6
Record Series Code
45.160
Record Series Name
Resolutions
Supplemental fields
Test
RES 2013-09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Work. <br /> b. prepare final design(Construction Plans)in accord with the requirements of <br /> the latest edition of the American Association of State Highway <br /> Transportation Officials (AASHTO) manual or other standard, such as the <br /> Uniform Building Code, as approved by CDOT. <br /> c. prepare special provisions and estimates in accord with the State's Roadway <br /> and Bridge Design Manuals and Standard Specifications for Road and Bridge <br /> Construction. <br /> d. include details of any required detours in the Plans, in order to prevent any <br /> interference of the construction work and to protect the traveling public. <br /> e. stamp the Plans produced by a Colorado Registered Professional Engineer. <br /> f. provide final assembly of Plans and contract documents. <br /> g. be responsible for the Plans being accurate and complete. <br /> h. CDOT shall consult with the Local Agency throughout the preparation of the <br /> Plans and submit to the Local Agency for its review the proposed Plans prior <br /> to CDOT's acceptance of Release for Construction Plans The Local Agency <br /> must provide comments on the proposed Plans within 10 working days after <br /> the proposed final Plans are referred to it. CDOT will require the <br /> Concessionaire to address all issues identified by the Local Agency provided <br /> those issues are not in conformance with the Contract Documents. <br /> i. CDOT will conduct a final walk through of the Diverging Diamond <br /> Interchange with the Local Agency prior to final acceptance. CDOT will <br /> require the Concessionaire to address all issues identified by the Local <br /> Agency as a result of such final walk through prior to CDOT's acceptance of <br /> the Diverging Diamond Interchange provided such issues are consistent with <br /> the requirements of the Plans.. <br /> i. make no further changes in the Plans following the award of the construction <br /> contract except by agreement in writing between the Parties. The Plans shall <br /> be considered final when approved and accepted by the Parties hereto, and <br /> -when final they shall be deemed incorporated herein. <br /> B. Construction [if applicable] <br /> 1. If the Work includes construction, the responsible party shall perform the <br /> construction in accordance with the approved design plans and/or administer the <br /> construction all in accord with the Scope of Work(Exhibit A). Such administration <br /> shall include project inspection and testing; approving sources of materials; <br /> performing required plant and shop inspections;documentation of contract payments, <br /> testing and inspection activities; preparing and approving pay estimates; preparing, <br /> approving and securing the funding for contract modification orders and minor <br /> contract revisions; processing contractor claims; construction supervision; and <br /> meeting the Quality Control requirements of the FHWA/CDOT Stewardship <br /> Agreement, as described in the Scope of Work. <br /> 2. If the State is the responsible party: <br /> Page 5 of 1 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.