Laserfiche WebLink
October 6, 2004 <br />Sandy Salyard <br />Xcel Energy <br />2655 N. 63rd St. <br />Boulder, CO 80301 <br />Subject: Roosevelt Ave. Utility Undergrounding <br />Dear Sandy: <br />In 2005, the City will be reconstructing Roosevelt Ave. from West Street to Bella Vista <br />Drive as well as developing the Community Park east of Roosevelt Ave. (see attached). <br />Currently, Xcel Energy's utilities are above ground on the west side of Roosevelt (see attached). <br />We would like Xcel to underground their utilities from West St. to Bella Vista Dr. and move <br />them to the east side of Roosevelt Street. <br />All undergrounding utility work for 2005 should be completed prior to the end of <br />February. Community Park construction begins at the end of March. Thanks you for your <br />cooperation. <br />If you should have any questions concerning the above, please don't hesitate to contact <br />me at 303-335-4611. <br />Sincerely, <br />Dave Lefaive, P.E. <br />Civil Engineer <br />Enclosure <br />G:\PWSHARED\Dave\2005 Street recon\Utility coord\undergroundingltr.doc <br />