Laserfiche WebLink
Xcel Energy= <br /> DELIVERY <br /> • <br /> Boulder Design Team <br /> 2655 N.63rd St. <br /> Boulder, CO 80.301 <br /> March 16, 2004 <br /> City of Louisville <br /> Attn Kathy <br /> 749 Main St. <br /> RE: Request For New Electric Extension 32-126441 <br /> Service Address 955 Bellevista drive <br /> Dear Kathy <br /> Thank you for requesting electric conversion to the above referenced location. As your primary contact <br /> person for this project at Public Service, I'm committed to providing the coordination and support needed <br /> to satisfy your energy needs and meet your project schedule. <br /> Based on information you have provided and the service requirements requested, I have completed the <br /> engineering design and cost estimate to provide for the Electric conversion. The cost to provide the <br /> requested Electric conversion is $12,061.68. This cost includes construction of a terminal pole on the east <br /> side of 96`I',boring 96L'' st and then installing a new 75kva 277/480 volt transformer at site by the parking <br /> area. Xcel will require an easement for this as well. Our Right of Way agent will supply the necessary <br /> foiuis for this. <br /> The construction order will not be released to our Construction Department for work <br /> scheduling until the Quote letter is signed and returned. At present, our Construction <br /> Department requires a 8 —10 week lead-time to start after receiving the order for <br /> scheduling. This estimate will expire on 06/06/05 <br /> Also enclosed are two copies of the proposed electric distribution design. Please review this design, sign <br /> your concurrence and return one copy for our records. <br /> If this project is constructed during frost conditions, you will billed for the depth of frost <br /> encountered,snow removal and/or any additional costs incurred in providing service. These charges <br /> are for moving onto the job site only one time and completing construction at that time. If the <br /> construction route has obstructions and requires additional move-out and move back in labor, a non- <br /> refundable cost of approximately$1,500.00 will be applied. <br /> This estimate is valid until 06/06/05 and is subject to price increases thereafter. To minimize any possible <br /> delay in meeting your construction schedule, it is imperative that you sign and return all agreements. <br /> Please have the party responsible for your job site coordination review the List of Standard <br /> Contingencies and notify me of any problems in complying with these requirements. Please sign the <br /> enclosed Contingency List. Construction can not be scheduled until it is received. Should you request <br /> a revised estimate prior to the expiration, an additional engineering charge may be required. <br />