My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Revitalization Commission Agenda and Packet 2013 06 10
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
REVITALIZATION COMMISSION
>
2004-2019 Revitalization Commission Agendas and Packets
>
2013 Revitalization Commission Agendas and Packets
>
Revitalization Commission Agenda and Packet 2013 06 10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 10:19:25 AM
Creation date
6/12/2013 11:15:58 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
RCPKT 2013 06 10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br />LOUISVILLE REVITALIZATION COMMISSION <br /> <br />LOUISVILLE REVITALIZATION <br />COMMISSION <br />SUBJECT: SOUTH STREET GATEWAY UNDERPASS DESIGN REFERRAL <br /> <br />DATE: JUNE 10, 2013 <br /> <br />PRESENTED BY: AARON DEJONG, ECONOMIC DEVELOPMENT <br /> <br /> <br />SUMMARY: <br />The LRC is partially funding the South Street Gateway Underpass that will connect <br />downtown Louisville with the Highway 42 Revitalization Area. As part of the agreement <br />with the City to fund the Gateway, LRC gets to review the design of the Gateway. <br /> <br />DISCUSSION: <br />Atkins Engineering is the design firm hired to do the design and engineering of the <br />project. They will present the current design concepts prepared to date. Staff requests <br />LRC input into the design. <br /> <br />ACTION STEP: <br />Staff requests LRC input into the design of the South Street Gateway Underpass.
The URL can be used to link to this page
Your browser does not support the video tag.