Laserfiche WebLink
EXHIBIT A <br />Description of Project Improvements <br />Sewer Main Line <br />• Connection to Existing Sewer Main <br />• 6" PVC Sanitary Sewer Service (146 If) <br />• 48" Sanitary Sewer Manhole <br />Storm Drain Utilities <br />• 48" Storm Manhole <br />• Type 13 Inlet <br />• 18" RCP Storm Drain Line (630 If) <br />• 5' Type R Inlet <br />• Outlet Structure <br />• 12" RCP Storm Drain Line (48 If) <br />• Connection to existing inlet (2) <br />Water Main Line <br />• 6" DIP Fire Hydrant (3) <br />• 8" PVC Water Main (160 If) <br />• Connection to existing Water Main (3) <br />• 4" DIP Fire Line w /Riser <br />• 1" Irrigation Water Service <br />• 2" Domestic Water Service <br />• 8" PVC Water Main (115 If) <br />• Asphalt Removal and Replacement (2984 sf) <br />• Flowable Fill (150 cy) <br />• Traffic Control (9 days) <br />• Ex. Waterservice to ADJ Apartments <br />• Increase 2" water to 3" water <br />Cast -In -Place Concrete <br />• Concrete Sidewalk (3600 sf) <br />• Retention Pond Concrete Swale (30 If) <br />• Retention Pond Concrete Curb (60 If) <br />Simulated Masonry <br />• MSE Retaining walls in Detention Pond (225 sf) <br />Electrical <br />• Street Light Poles along Centennial Drive (4) <br />