Laserfiche WebLink
SUBJECT: PLANNING COMMISSION 2013 2014 WORK PLAN <br />DATE: SEPTEMBER10, 2013 <br />PAGE2OF3 <br />Residential Estate Zone District Rezoning to Each neighborhood will be addressed as part of the neighborhood <br />Residential Low Density / Single Family High plans. <br />Density Zone District <br />- Significant yard & bulk mismatch with lot <br />sizes <br />2013/ 2014 Work Plan Item <br />Planning <br />Small Area Plan for McCaslin and South Boulder Road <br />Form Based Code as part of small area plans <br />Fiscal Model Update <br />Neighborhood Plans <br />Monarch <br />Fireside <br /> <br />Create Wayfinding plans for <br />South Boulder Road <br />Colorado Technology Center <br />McCaslin Boulevard <br />Pedestrian Plaza and Kiosk <br />Downtown, Chase Bank <br />Update Downtown Parking Analysis and Recommendations <br />LMC. Modifications <br />Retail Marijuana <br />Food Trucks <br />Current Planning <br />DELO Final Plat/PUD <br />Coal Creek Station Final Plat/PUD and rezoning <br />CTC 1722 Prairie Way Final PUD & 1900 Cherry <br />Alkonis Property Annexation/Rezoning/Plat/PUD <br />Steel Ranch MarketPlace Final Plat/PUD <br />City Shops Final Plat/PUD <br />Tebo Rezoning/PUD <br />St. Louis Parish Final PUD <br />Urban Design <br />McCaslin Branding & Wayfinding as part of small area plan <br />South Street Gateway design coordination <br />Downtown Newspaper Vending Machines <br />Historic Preservation <br />- <br />Citywide Preservation Master Plan (includes: Historical Survey f future eligible historic properties <br />(next 20 years) <br />Historic Park Feasibility Analysis <br />Downtown Design Handbook Update <br />Transportation Planning <br />US 36 Phase 2 Construction Review <br />Northwest Area Mobility Study (NAMS) <br />Final Design of Highway 42 from Paschal to Locke <br />Main Street Realignment Feasibility Study <br />Lee to Pine Right of Way acquisition <br />CITY COUNCIL COMMUNICATION <br />3 <br />