Laserfiche WebLink
Exhibit A <br /> Table 10: Excavation, Right-of-Way, and Easement Work Permit Fees <br /> All Right-of-Way permits shall require a base fee. Additional fees shall be assessed to the permit depending on the <br /> services required,the type of work, location of work, and the inspection requirements. Permit fees shall be paid prior <br /> to the issuance of the right-of-way permit. Fees shall be doubled if work has begun prior to issuing the permit. <br /> Right-of-Way Base Fees <br /> All Permits Applications I $50.00/each <br /> Right-of-Way Inspection Service Fees <br /> Initial Inspection Included in permit fees <br /> (A) Re-Inspections(2nd, 3rd,4th, etc.) $50.00/hr, 1 hour minimum <br /> (B) Failure to Schedule Inspection $50.00/one-time fee <br /> (C) Not ready for scheduled inspection $75.00/hr, 1 hour minimum <br /> (D) After-Hours Inspection $50.00/half-hour <br /> Utility Fees <br /> Underground Dry Utilities(Gas, Communication, Electric) $0.25/Linear Foot <br /> Underground Wet Utilities(Water,Sanitary, Storm) $1.00/Linear Foot <br /> Water,Sanitary, Storm Main Connection Fee $75.00/each <br /> Boring $0.25/Linear Foot <br /> Dry Utility Appurtenances $5.00/each <br /> Pothole Fee $10.00/each <br /> Asphalt&Concrete Fees <br /> Curb&Gutter,Sidewalk, Crosspan/Ramp Drive $0.25/Linear Foot,$0.25/Square Foot <br /> Asphalt Paving/Patching $18.00/Square Yard <br /> Asphalt Patching New Asphalt(<5 years old)* Additional $9.00/Square Yard <br /> Asphalt Patching Recent Surface Treatment(< 2 years old)* Additional $500.00/each cut <br /> Other Applicable Fees <br /> (E) No Permit for the job 2X permit Base Fee <br /> (F) Emergency/ Expedite * 2X permit Base Fee <br /> (G) Special Use* $50.00/week <br /> *Refer to General Permit Requirements OR at the discretion of the Engineer <br />