My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Historic Preservation Commission Agenda and Packet 2014 01 13
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
HISTORIC PRESERVATION COMMISSION
>
2005-2019 Historic Preservation Commission Agendas and Packets
>
2014 Historic Preservation Commission Agendas and Packets
>
Historic Preservation Commission Agenda and Packet 2014 01 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 3:08:17 PM
Creation date
1/14/2014 9:12:19 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
HPCPKT 2014 01 13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bring existing electrical up to code $27,858 <br />Install new high efficiency furnacefair conditioner and make up air $50,000 <br />Provide additional ventilation to attic and lounge areas to code $ 2,080 <br />Re -route pipes located outside of building inside $ 4000 <br />Subtotal of category $88,398 <br />Fire safe#v <br />Run fire line into building and repair right of way, install sprinkler system $32,600 <br />Install fire alarm system if necessary $ 6,500 <br />Enclose hood duct with fire rated enclosure to code if necessary $ 6.000 <br />Subtotal of category $45,100 <br />E. COST OF NEW ADDITION TO THE SOUTH OF EXISTING BUILDING <br />One story, approximately 980 SF, two new restrooms in rear (deducting <br />costs of rooftop patio being deleted) <br />$220,500 <br />Summary of Project <br />A. Structural repairs existing building $ 84,384 <br />B. Repair and rehabilitation of exterior of existing building $ 67,663 <br />C. Repair and rehabilitation of interior of existing building $ 36,400 <br />D. Plumbing, electrical and HVAC renovations $ 88,398 <br />Fire safety issues $ 45,100 <br />E. New addition to building $220,500 <br />Estimated project cost* $542,445 <br />*hard costs exclusive of permit fees, architect and engineering fees, interior finish <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.