My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Historic Preservation Commission Agenda and Packet 2014 01 13
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
HISTORIC PRESERVATION COMMISSION
>
2005-2019 Historic Preservation Commission Agendas and Packets
>
2014 Historic Preservation Commission Agendas and Packets
>
Historic Preservation Commission Agenda and Packet 2014 01 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 3:08:17 PM
Creation date
1/14/2014 9:12:19 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
HPCPKT 2014 01 13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
If partial incentive funding were awarded, would you complete your project? <br />❑ YES ❑ NO <br />It would depend upon amount awarded <br />ADDITIONAL MATERIALS REQUIRED <br />The following items must be submitted along with this application: <br />a. One set of photographs or slides for each feature as described in Item 4 "Description of <br />Rehabilitation ". Please label of each photograph with the address of your property and the <br />feature number. <br />PIease see structural engineer report and photos provided <br />b. A construction bid if one has been made for your project (recommended). <br />See attached construction estimates <br />c. Working or scaled drawings, spec sheets, or materials of the proposed work if applicable to <br />your project. Previously provided <br />7. Assurances <br />The Applicant hereby agrees and acknowledges that: <br />A. Funds received as a result of this application will be expended solely on described projects, <br />and must be completed within established timelines. <br />B. Awards from the Historic Preservation Fund may differ in type and amount from those <br />requested on an application. <br />C. Recipients must submit their project for any required design review by the Historic <br />Preservation Commission and acquire any required building permits before work has started. <br />D. All work approved for grant funding must be completed even if only partially funded through <br />this incentives program. <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.