Laserfiche WebLink
Hole by Hole Analysis <br />GOLF COURSE <br />Louisville, CO <br />Hole 2 <br />Construct new 25' x 25' forward tee <br />as mitigation for future flood events <br />Repair rough and pond bank damaged by flooding: <br />Strip sod, remove silt, regrade for positive surface <br />drainage, and regrass (-42,900 sf) <br />Widen cart path at green <br />Cart Path: 4' y, 50' <br />Curbing: 70 If <br />Reconstruct bunkers <br />Bunker A: 385 sf <br />Bunker B: 360 sf <br />Sod: 3,660 sf <br />Topsoil: 5 cy <br />Extemal tile: 100 If <br />Existing drain pipe is plugged by silt and <br />needs to be replaced with new inlet and pipe. <br />Catch Basin: 1 ea <br />Draintile: 125 If <br />Topsoil: 10 cy <br />Sod: 1,500 sf <br />Widen cart path at green <br />Cart Path: 4' x 50' <br />Curbing: 70 If <br />Remove bunker, shave down <br />greenside edge, add mound and <br />expand 900 sf collar run -off ans <br />re -grass <br />363. <br />Reconstruct 30' x 40' middle tee: <br />split and elevate as mitigation for <br />future flood events <br />Reconstruct tees <br />Strip sod, relocate /reshape tee surface, <br />add rootzone mix and re- grass. <br />Back: 25' x 25' <br />Middle Back: 40' x 70' <br />Sod: 17,300 sf <br />0 <br />' >c <br />tsr <br />22 <br />KEY <br />Repair 4,300 sf green: <br />Strip sod, remove silt, add <br />greensmix, regrade and regrass <br />Reconstruct bunker <br />Bunker: 775 sf <br />Sod: 3,120 sf <br />Topsoil: 10 cy <br />Extemal tile: 20 If <br />Reconstruct pond edge, adjust overflow to <br />lower water level 18 inches and sod bank <br />down to water level. <br />Sod: 3,935 sf <br />Storm Damage Improvement <br />Golf Course Improvement <br />Recommendations <br />Date. January 7, 2014 <br />0 100 200 300 <br />