My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Golf Course Advisory Board Agenda and Packet 2014 01 13
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
GOLF COURSE ADVISORY BOARD
>
2014 Golf Course Advisory Board Agendas and Packets
>
Golf Course Advisory Board Agenda and Packet 2014 01 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 2:43:05 PM
Creation date
1/14/2014 10:25:30 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
GCABPKT 2014 01 13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hole by Hole Analysis <br />GOLF COURSE <br />Louisville. CO <br />Hole 6 <br />Repair fairway /rough areas damaged by flooding: <br />Strip sod, remove silt, regrade for positive <br />surface drainage, and regrass (-33,150 sf) [R: 30,000 sf] <br />Realign and expand fairway <br />Remove brush and selective trees to <br />open sightline and improve turf quality <br />- by owner <br />Replace bridge, abutments, and <br />cart path approaches that were <br />destroyed by the flood <br />Relocate bridge and realign <br />cart path to mitigate future <br />flood damage <br />Strip sod, level 3,130 sf tee <br />and regrass <br />Remove trees to improve turf <br />quality and open sightlines <br />- by owner <br />Widen cart path at tee <br />Cart Path: 4' x 50' <br />Curbing: 70 If <br />Strip sod, level 1,590 sf tee <br />and regrass <br />Rebuild 1,770 sf tee: <br />Strip sod, remove silt, regrade tee surface, <br />add rootzone mix and reseed <br />Repair rough damaged by flooding: <br />Strip sod, remove silt, regrade for positive <br />surface drainage, and regrass (-3,900 sf) <br />Rebuild 900 sf forward tee: <br />Strip sod, remove silt, regrade tee surface, add <br />rootzone mix and reseed <br />Repair pond banks and 7 fairway damaged by flooding: <br />Strip sod, remove silt, cobbles, and debris regrade for <br />positive surface drainage, and regrass <br />Repair fairway /rough areas damaged by flooding: <br />Strip sod, remove silt, regrade for positive <br />surface drainage, and regrass (- 21,000 sf) [R: 30,000 sf] <br />Repair abutments and adjacent cart path <br />that were undermined by flood waters <br />Eliminate front greenside bunker, and rebuild right <br />greenside bunker: <br />Remove contaminated sand, replace drainage, restore <br />edges, add new sand and regrass surrounds. <br />Bunker: 925 sf <br />External tile: 125 If <br />Sod: 3,100 sf <br />Thin trees to improve turf quality <br />- by owner <br />Repair 4,800 sf green and surrounds: <br />Strip sod, remove silt, remove "collar dam" <br />add greensmix, regrade and regrass <br />26 <br />KEY <br />Storm Damage Improvement <br />Golf Course Improvement <br />Recommendations <br />Date: January 7, 2014 <br />0 100 200 300 FT <br />
The URL can be used to link to this page
Your browser does not support the video tag.