My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Golf Course Advisory Board Agenda and Packet 2014 01 13
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
GOLF COURSE ADVISORY BOARD
>
2014 Golf Course Advisory Board Agendas and Packets
>
Golf Course Advisory Board Agenda and Packet 2014 01 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 2:43:05 PM
Creation date
1/14/2014 10:25:30 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
GCABPKT 2014 01 13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hole by Hole Analysis <br />GOLF COURSE <br />Louisville. CO <br />Hole 10 <br />Remove brush and selective trees to <br />open sightline and improve turf quality <br />- by owner <br />Expand fairway to improve playability <br />Repair fairway/rough areas damaged by flooding: <br />Strip sod, remove silt, regrade for positive surface <br />drainage, and regress (-116,000 sf) [R: 60,000 sf] <br />Expand fairway to improve playability <br />Relocate 25' x 25' forward tee: <br />Remove selective trees to open <br />sightline and improve turf quality <br />- by owner <br />Replace cart path to <br />clubhouse <br />12' wide path: 160 If <br />6' wide path: 55 If <br />Remove spruce tree <br />- by owner <br />Complete rebuild of 5,500 sf green <br />complex - see Green Drawing <br />-^‘ <br />\ <br />100 <br />9 <br />Replace 550 If of cart path <br />Replace bridge and <br />shift location east <br />Replace & repair stream channe <br />Replace 150 If of cart path <br />Widen cart path at tee <br />Cart Path: 4' x 50' <br />Curbing: 70 If <br />Rebuild tees: <br />Strip sod, remove silt, regrade tee surface aligning <br />toward the landing area, add rootzone mix and regress. <br />Back: 25' x 25' <br />Middle Back: 40' x 65' <br />Middle Front: 35' x 40' <br />Repair fairway/rough areas damaged by flooding: <br />Strip sod, remove silt, regrade for positive surface <br />drainage, and regrass (-24,500 sf) <br />30 <br />KEY <br />V.T <br />Rebuild bunkers: <br />Remove contaminated sand, replace drainage, <br />restore edges, add new sand and regrass surrounds <br />Bunker A: 1,440 sf <br />Bunker B: 380 sf <br />Extemal tile: 125 If <br />Sod: 2,900 sf <br />Repair fairway/rough areas and pond <br />banks damaged by flooding: <br />Strip sod, remove silt, regrade for <br />positive surface drainage, and regrass <br />(-77,000 sf) [R: 60,000 sf] <br />Storm Damage Improvement <br />Golf Course Improvement <br />Recommendations <br />Date January 7, 2014 <br />0 100 200 <br />300 FT <br />
The URL can be used to link to this page
Your browser does not support the video tag.