My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Golf Course Advisory Board Agenda and Packet 2014 01 21 SP
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
.Boards Commissions Committees No Longer in Existence
>
GOLF COURSE ADVISORY BOARD
>
2014 Golf Course Advisory Board Agendas and Packets
>
Golf Course Advisory Board Agenda and Packet 2014 01 21 SP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 2:43:05 PM
Creation date
1/27/2014 11:00:04 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
GCABPKT 2014 01 21 SP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br />Hole by Hole Analysis <br />GOLF COURSE <br />Louisville, CO <br />Hale 12 <br />Repair fairway /rough areas damaged <br />by flooding: <br />Strip sod, remove silt, regrade for <br />positive surface drainage, and <br />regrass (— 29,000 sf) [R: 24,000 sf] <br />Realign cart path and <br />widen at the green. <br />Cart Path: 4' x 30' <br />Curbing: 40 If <br />Convert 52,450 sf of out -of -play <br />area to low - maintenance turf in <br />conjunction with hole 8 <br />Strip sod, level 960 sf tee <br />and regrass <br />Relocate and mitigate <br />forward tee with 25' x 30' <br />tee to improve playability <br />120'19 <br />Rebuild bunker: <br />Remove contaminated sand, replace drainage, <br />restore edges (lower to improve visibility), add <br />new sand and regrass surrounds. <br />Bunker: 640 sf <br />Exernal tile: 100 If <br />Sod: 1,950 sf <br />Repair 5,350 sf green and surrounds: <br />Strip sod, remove silt, remove "collar dam" <br />add greensmix, regrade and regrass <br />Shorten fairway to <br />reduce maintenance <br />Reconstruct tees <br />Strip sod, reshap tee <br />surface, add rootzone <br />mix and re- grass. <br />Back: 30' x 30' <br />Middle Back: 35' x 80' <br />Sod: 4,650 sf <br />Repair fairway /rough and pond bank areas damaged by flooding: <br />Strip sod, remove silt, regrade for positive surface drainage, and <br />regrass (— 43,450 sf in conjunction with hole 11) [R: 24,000 sf] <br />Rebuild and shift bunkers: <br />Remove contaminated sand, replace drainage, <br />restore edges, add new sand and regrass surrounds. <br />Bunker A: 2,065 sf <br />Bunker B: 460 sf <br />External tile: 200 If <br />Sod: 8,675 sf <br />17 <br />KEY <br />Storm Damage Improvement <br />Golf Course Improvement <br />Recommendations <br />Date: January 7, 2014 <br />0 100 200 <br />300 FT <br />
The URL can be used to link to this page
Your browser does not support the video tag.