My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Golf Course Advisory Board Agenda and Packet 2014 01 21 SP
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
.Boards Commissions Committees No Longer in Existence
>
GOLF COURSE ADVISORY BOARD
>
2014 Golf Course Advisory Board Agendas and Packets
>
Golf Course Advisory Board Agenda and Packet 2014 01 21 SP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 2:43:05 PM
Creation date
1/27/2014 11:00:04 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
GCABPKT 2014 01 21 SP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.Hole by Hole Analysis <br />ef,redt <br />GOLF COURSE <br />Louisville, CO <br />Hole 14 <br />Add fairway bunker to <br />define the landing area. <br />Bunker: 1,540 sf <br />External tile: 150 If <br />Topsoil: 10 cy <br />Sod: 2,350 sf <br />Remove selective trees, including <br />cottonwood, to improve safety and <br />sightline to the landing area - by owner <br />Add catch basin with draintile to <br />improve drainage. <br />Catch Basin: 1 ea <br />Draintile; 100 If <br />Repair 6,231 sf green: <br />Strip sod, remove silt, <br />add greensmix, regrade <br />and regrass <br />Rebuild 1,985 sf tee: <br />Strip sod, remove silt, regrade tee <br />surface, add rootzone mix and reseed <br />Rebuild 3,400 sf tee: <br />Strip sod, remove silt, regrade tee <br />surface, add rootzone mix and reseed <br />Rebuild 3,400 sf tee: <br />Strip sod, remove silt, regrade tee <br />surface, add rootzone mix and reseed <br />Shorten fairway to <br />reduce maintenance <br />Repair areas damaged by flooding: <br />Strip sod, remove silt, regrade for positive <br />surface drainage, and regrass (— 5,000 sf) <br />Widen fairway to define <br />the landing area <br />Replace cart <br />path to tunnel <br />Add catch basins <br />Catch Basin: 2 ea <br />Draintile: 350 If <br />Widen cart path at tees <br />Cart Path: 4' x 50' <br />Curbing: 70 If <br />Construct new 25' x 30' forward tee <br />Repair leaking overflow pipe <br />Repair areas damaged by flooding: <br />Strip sod, remove silt, regrade for positive <br />surface drainage, and regrass (— 18,500 sf) <br />[R: 20,000 sf] <br />Re -line pond and repair overflow structure <br />h draintile to improve drainage_ <br />(14 <br />140 <br />r9 <br />Widen cart path at green <br />Cart Path: 4' x 50' <br />Curbing; 70 If <br />Regrade 27,500 sf of fairway /rough to <br />improve playing surface and drainage <br />Add catch basin <br />Catch Basin' 1 ea <br />Draintile: 175 If <br />h draintile to improve drainage. <br />Rebuild bunker: <br />Remove contaminated sand, reduce size to improve maintenance, <br />and shift closer to the fairway, replace drainage, restore edges, add <br />new sand and regrass surrounds. <br />Bunker: 1,900 sf <br />Extemal tile: 125 If <br />Sod: 6,615 sf <br />Rebuild greenside bunkers: <br />Remove contaminated sand, replace drainage, <br />restore edges, add new sand and regrass <br />surrounds. <br />Bunker A: 330 sf <br />Bunker B: 420 sf <br />External tile: 200 If <br />Sod: 2,900 sf <br />19 <br />KEY <br />[Storm Damage Improvement <br />Golf Course Improvement <br />Recommendations <br />Date: January 7, 2014 <br />0 100 200 300 FT <br />
The URL can be used to link to this page
Your browser does not support the video tag.