My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Open Space Advisory Board Agenda and Packet 2014 10 08
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
OPEN SPACE ADVISORY BOARD
>
2000-2019 Open Space Advisory Board Agendas and Packets
>
2014 Open Space Advisory Board Agendas and Packets
>
Open Space Advisory Board Agenda and Packet 2014 10 08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 8:21:24 AM
Creation date
10/14/2014 9:27:45 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
OSABPKT 2014 10 08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2014 Open Space Wayfinding Schedule <br />Project Timeline <br />Fee <br />RFP Reference & Task <br />1.01 General <br />1.1110c koff Meeting with Staff and OSAB 1 Review Schedule, Final. Meeting Oates, Collaboration <br />October 2014 <br />November 2014 <br />December 2014 <br />January 2015 <br />e <br />Q 1 <br />2.1 1 Recommended Revisions to Sign Text/Color/Symbols <br />2.1.1 1 Document existing text/colors/symbols of edstirg sgnage within trail system <br />I <br />2.1.21 Evaluate text/colors/symbols against best practice precedents (Deliverable) <br />1 <br />2.1.31 C11eate recommendations for revisions to existing signage to d/cobrstsymbols (Deliverable) <br />I_I <br />22 I Thee Concept Options for the Sign Package <br />2 2.1 1 Ueatbn of three (3) options for the sign package (Deliverable) <br />I <br />Staff & OSAB Meeting 1 Review d three sign concepts <br />t➢ <br />2221 Hral sign package concept <br />Staff & OSAB Meeting l Rnel concept review and approval <br />2.2.3 1 Specification tempbte / bid set & cast estimate (Deliverable) <br />I <br />City Counc l Meeting 1 Presentation 016001 sgn concept and cost estimate <br />2.31 Recommended Sign Locations & Phasing <br />2 3.1 1 U001bn of map & AHCNIEW layer with recommended sign locators & phasing (Deliverable) <br />I I <br />23.21 C7eatbn of cost estimate for each recommended sign phase (Deliverable) <br />Cly Counc it Meeting 1 Presentation of final sign locations and phasing <br />a <br />_ <br />3.01 Trais <br />3.1 1 NewTrail Recommendations & Phasing <br />1 I <br />3.1.1 1 Ueatbn of map &AHL'MEW layer for nev trail recommendstims & phasing (Deliverable) <br />1 <br />3.1.2 10reation of sketches detailing le0omrrsnczd trail modifications to existing trails (Deliverable) <br />321Trai Naming Concepts <br />I I <br />32.1 1 Ueation of three (3) concepts for recommended trail naming system, phasing, & renderings (Deliverable) <br />ID <br />Staff & OSAB Meeting 1 Review of naming for trail nang syskvey phasinrenderings ig & renderings <br />I <br />3.221 Hnalte naming concept & suppor3rg graphds (Deliverable) <br />4.11 Enhancing the Trail Map <br />41.1 1 Ueation of three (3) concept options for enhancing the tail map (Deliverable) <br />4.21 Public Education& Outreach to Enhance Warlinding <br />4.2.1 1 Cleatbn of three 63 concept options for public education &outreach to enhance wayfinding (Deliverable) <br />
The URL can be used to link to this page
Your browser does not support the video tag.