My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2014-73
PORTAL
>
CITY COUNCIL RECORDS
>
RESOLUTIONS (45.160)
>
2010-2019 Resolutions
>
2014 Resolutions
>
Resolution 2014-73
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2021 4:02:44 PM
Creation date
11/19/2014 8:13:10 AM
Metadata
Fields
Template:
City Council Records
Also Known As (aka)
Drainageway A-2 UDFCD Agreement Amendment
Doc Type
Resolution
Signed Date
11/18/2014
Ord/Res - Year
2014
Ord/Res - Number
73
Original Hardcopy Storage
7D6
Supplemental fields
Test
RES 2014-73
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C. Construction. PROJECT shall include construction by DISTRICT of the drainage and <br />flood control improvements as set forth in the final design and vegetation <br />establishment. <br />2. Paragraph 4. PROJECT COSTS AND ALLOCATION OF COSTS is deleted and replaced as <br />follows: <br />4. PROJECT COSTS AND ALLOCATION OF COSTS <br />A. PARTIES agree that for the purposes of this Agreement PROJECT costs shall consist <br />of and be limited to the following: <br />1. Final design services; <br />2. Delineation, description and acquisition of required rights -of -way/ easements; <br />3. Construction of improvements; <br />4. Contingencies mutually agreeable to PARTIES. <br />B. It is understood that PROJECT costs as defined above are not to exceed $1,775,000 <br />without amendment to this Agreement. <br />PROJECT costs for the various elements of the effort are estimated as follows: <br />PREVIOUSLY <br />ITEM AS AMENDED AMENDED <br />1. Final Design $ 200,000 $ 200,000 <br />2. Right -of -way 50,000 50,000 <br />3. Construction 1,425,000 1,100,000 <br />4. Contingency 100,000 100,000 <br />Grand Total $1,775,000 $1,450,000 <br />This breakdown of costs is for estimating purposes only. Costs may vary between the <br />various elements of the effort without amendment to this Agreement provided the <br />total expenditures do not exceed the maximum contribution by all PARTIES plus <br />accrued interest. <br />C. Based on total PROJECT costs, the maximum percent and dollar contribution by each <br />party shall be: <br />Percentage Previously Additional Maximum <br />Share Contributed Contribution Contribution <br />DISTRICT 48.00% $ 725,000 $125,000 $ 850,000 <br />CITY 48.00% $ 725,000 $125,000 $ 850,000 <br />LAFAYETTE 4.00% $ -0- $ 75,000 $ 75,000 <br />TOTAL 100.00% $1,450,000 $325,000 $1,775,000 <br />\dcm \agrmnt\ 11/110403C 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.