Laserfiche WebLink
Exhibit A <br />Table 10: Excavation, Right -of -Way, and Easement Work Permit Fees <br />All Right -of -Way permits shall require a base fee. Additional fees shall be assessed to the permit depending on the <br />services required, the type of work, location of work, and the inspection requirements. Permit fees shall be paid prior <br />to the issuance of the right -of -way permit. Fees shall be doubled if work has begun prior to issuing the permit. <br />Right -of -Way Base Fees <br />All Permits Applications <br />1 <br />$50.00 /each <br />Right -of -Way Inspection Service Fees <br />Initial Inspection <br />Included in permit fees <br />(A) Re- Inspections (2nd 3rd 4th etc.) <br />$50.00 /hr, 1 hour minimum <br />(8) Failure to Schedule Inspection <br />$50.00 /one -time fee <br />(C) Not ready for scheduled inspection <br />$75.00 /hr, 1 hour minimum <br />(D) After -Hours Inspection <br />$50.00 /half -hour <br />Utility Fees <br />Underground Dry Utilities (Gas, Communication, Electric) <br />$0.25 /Linear Foot <br />Underground Wet Utilities (Water, Sanitary, Storm) <br />$1.00 /Linear Foot <br />Water, Sanitary, Storm Main Connection Fee <br />$75.00 /each <br />Boring <br />$0.25 /Linear Foot <br />Dry Utility Appurtenances <br />$5.00 /each <br />Pothole Fee <br />$10.00 /each <br />Asphalt & Concrete Fees <br />Curb & Gutter, Sidewalk, Crosspan /Ramp Drive <br />$0.25 /Linear Foot, $0.25 /Square Foot <br />Asphalt Paving / Patching <br />$18.00 /Square Yard <br />Asphalt Patching New Asphalt ( <5 years old)* <br />Additional $9.00 /Square Yard <br />Asphalt Patching Recent Surface Treatment (< 2 years old)* <br />Additional $500.00 /each cut <br />Other Applicable Fees <br />(E) No Permit for the job <br />2X permit Base Fee <br />(F) Emergency/ Expedite * <br />2X permit Base Fee <br />(G) Special Use* <br />$50.00 /week <br />*Refer to General Permit Requirements OR at the discretion of the Engineer <br />