My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Agenda and Packet 2015 01 08
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2015 Planning Commission Agendas Packets Minutes
>
Planning Commission Agenda and Packet 2015 01 08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:55:09 AM
Creation date
1/9/2015 11:25:16 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
PCPKT 2015 01 08
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning Commission <br />Meeting Minutes <br />December 11, 2014 <br />Page 2 of 17 <br />Motion made to grant continuance to AT &T Antennae to January meeting by Brauneis and <br />seconded by Russell. Motion passed by voice vote. <br />Discussion /Presentation — <br />Louisville Sustainability Advisory Board: Road map and energy report <br />Mary Ann Heaney, 117 LaFarge Avenue, Louisville, CO and Mark Persichetti, 1402 Taft Place, <br />Louisville, CO. Members of the Louisville Sustainability Advisory Board (LSAB). <br />Heaney gives first presentation. LSAB sponsored an energy study city -wide in 2013. A brief <br />summary of the results of the study is given so Planning Commission (PC) can consider it and <br />give input. LSAB is in the process of developing a long range sustainability roadmap for the <br />City. The study began at the University of CO by a professor who subsequently moved to <br />University of MN. She designed the criteria. The greatest energy use in the City is the <br />commercial industrial electrical use at 30 %, followed by gas vehicles, and then goods purchase <br />at 11.2 %. City Council asked the LSAB to come up with a Sustainability Action Plan and they <br />are presenting to all Advisory Boards and then plan to have public meetings with commercial <br />sector and general public to gain feedback, suggestions, and guidance. All information will then <br />be presented to the City with a recommended plan of direction and suggested programs. Goals <br />are based on economic drivers and voluntary programs rather than mandatory programs. <br />Boulder County has a program called PACE that encourages businesses to sign up, get a free <br />energy audit, and then work with program personnel for suggestions on energy usage reduction. <br />Heaney says 160 Louisville businesses have signed up for this program and 33 have completed <br />it. Savings have been approximately $90,000 so far. It has generated $400,000 in revenue in <br />Louisville with the construction and retrofits completed. Golden has several business programs <br />in place and Denver has been extremely proactive with new programs. Fort Collins, Carbondale, <br />and Boulder County have been proactive. Louisville was the 31st city in CO to go through this <br />energy analysis. LSAB now has information in a database that helps in determining what <br />energy savings are available. For example, if the City wishes to purchase more energy efficient <br />water pumps at the Waste Water Treatment Plant, the data can be plugged in to determine what <br />the return of energy savings would be. The PC is uniquely qualified to make comments and <br />suggestions because they see many projects pre ted. LSAB would like to come back to get <br />detailed comments in peon J <br />via email i r anu r February from the PC. <br />Mark Persichetti says the LAB study will be ed on the City website. He does not know if it <br />will be located under the Public Works link or LSAB link. It is a 40+ document but it does have <br />details of the different areas being studied and methods used for measuring greenhouse gas <br />emission and CO2 equivalents. <br />Questions from Commission: <br />Pritchard says that since the presentation was not submitted to the Planning Commission in <br />packet in advance, the PC ability to ask specific questions is somewhat limited. He requests that <br />the study be submittStaff and then submitted to the PC. <br />Moline asks if the repo has some recommendations. <br />Persichetti says the report has some general recommendations and some guidelines to <br />consider. It is left up to the LSAB to determine what the best path to follow is regarding the <br />reduction of greenhouse gas emission in any sector. The general study document is 45+ <br />pages. <br />Pritchard requests LSAB to submit the best document. He would like it submitted for the <br />January 8, 2015 meeting. <br />Brauneis says he is excited that there is real data to use to evaluate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.