My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2015 01 20
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2010-2019 City Council Agendas and Packets
>
2015 City Council Agendas and Packets
>
City Council Agenda and Packet 2015 01 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:08:08 PM
Creation date
1/23/2015 10:11:25 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
7A4
Record Series Code
45.010
Supplemental fields
Test
CCAGPKT 2015 01 20
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Council <br />Meeting Minutes <br />January 6, 2015 <br />Page 9 of 15 <br />(less than 1 foot) and in other areas the flooding may range from 2 to 4 feet. He stated <br />east of Highway 42 there are very strong currents and local flows in the open space <br />areas. He noted there are condos, homes and a school on the Lafayette side, which <br />have seen some damaging flooding. In the downtown area, the water tends to pond, <br />but they may have very strong undercurrent around the inlet areas. <br />Mayor Pro Tem Dalton agreed with Mayor Muckle that cities provide infrastructure to <br />protect their residents' properties by eliminating flooding problems. <br />Public Works Director Kowar explained staff will proceed with the design and the loan <br />applications. Within a month or two staff will present a loan agreement and a contract <br />with Urban Drainage for Council consideration. <br />CONSTRUCTION MANAGEMENT SERVICES AGREEMENT WITH <br />DEWBERRY ENGINEERS, INC. FOR WASTEWATER TREATMENT <br />FACILITY UPGRADES <br />Mayor Muckle requested a staff presentation. <br />Public Works Director Kowar introduced the City's Water Resources Engineer Dmitry <br />Tepo, who will be the Project Engineer for this project and Patrick Radebaugh <br />representing Dewberry Engineers, Inc., who will provide the design and assist in the <br />grant applications. <br />Water Resources Engineer Tepo explained before the City Council is a Construction <br />Management Services Agreement with Dewberry Engineers, Inc., for Waste Water <br />Treatment Facility upgrades. For the past year and a half, Dewberry and the City have <br />been working on designing the upgrades to the Louisville Wastewater Treatment Plant. <br />These upgrades are regulation driven by the Colorado Department of Public Health and <br />Environment. Dewberry's scope of work for the current contract is for the design <br />services only. Staff proposes another contract for bid phase services, construction <br />management, as well as design of minor items relating to WWTP upgrades, not <br />included in the original scope. Staff recommended the City Council contract with <br />Dewberry for bid and construction phase services on sole source basis in the amount of <br />$1,557,080. Staff recommended sole source, rather than an open bid, based on the <br />following: <br />• The design drawings and specifications were produced by Dewberry and <br />Dewberry is in the best position to address contractor's questions and provide <br />clarifications that will come up during bidding and construction. <br />• If a new firm is hired, the City could encounter liability issues during the <br />construction and warranty periods of the WWTP upgrades. If warranty work is <br />required, it will be difficult to identify the responsible party between the design <br />consultant, construction management consultant, contractor, or the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.