Laserfiche WebLink
February 4, 2015 | page A-3 <br />Louisville Elementary School <br />400 Hutchinson Street <br />Louisville, CO 80027 <br />Gross Square Footage: 63,034 sq. ft. <br />Original Construction Date: 1964 <br />Estimated Project Budget: $3,400,000 - $3,800,000* <br />Innovation: up to $200,000 <br />* Final project budget will be developed during the design phase. <br /> <br />Following is an overview of work that will be completed at the school: <br />Facility Condition • Exterior building improvements such as repair/replace <br />windows and doors <br />• Repair roof <br />• Replace interior doors <br />• Improvements to interior finishes such as carpet and paint <br />• Asbestos abatement <br />• Replace intercom <br />• Fire protection system improvements <br />• Electrical system upgrades including emergency generator <br />• Repair/replace fixtures such as casework <br />• Site improvements such as paving and drainage <br />• Restroom renovations <br />• Audio enhancement in every classroom** <br />Program Compatibility • Provide adequate space for full-day kindergarten** <br />• Provide adequate space for preschool** <br />• Provide adequate Special Education space <br />Health and Physical Development • Upgrade playground equipment and surface material <br />Safety and Security • Install camera/intercom security system <br />• Install electronic security controls <br />• Install security partitions <br />Sustainability • Conduct retro-commissioning and repairs <br />• Upgrade lighting <br />• Upgrade HVAC controls <br />Innovation Louisville Elementary School is eligible to receive up to <br />$200,000 in additional funds to implement facility <br />improvements that support innovative teaching methods. <br />** Not included in project budget <br /> <br />4