My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Study Session Agenda and Packet 2015 02 04 JT BVSD
PORTAL
>
CITY COUNCIL RECORDS
>
STUDY SESSIONS (45.010)
>
2010-2019 City Council Study Sessions
>
2015 City Council Study Sessions
>
City Council Study Session Agenda and Packet 2015 02 04 JT BVSD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 11:53:52 AM
Creation date
2/13/2015 3:18:04 PM
Metadata
Fields
Template:
CITYWIDE
Original Hardcopy Storage
6C6
Supplemental fields
Test
SSAGPKT 2015 02 04 JT BVSD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
February 4, 2015 | page A-5 <br />Monarch K-8 School <br />263 Campus Drive <br />Louisville, CO 80027 <br />Gross Square Footage: 114,491 sq. ft. <br />Original Construction Date: 1997 <br />Estimated Project Budget: $5,500,000 - $6,100,000* <br />Innovation: up to $400,000 <br />* Final project budget will be determined in the design phase. <br /> <br />Following is an overview of the work that will be completed at the school: <br />Facility Condition • Exterior building improvements such as masonry repair and <br />door repair/replacement <br />• Replace roof <br />• Improvements to interior finishes such as carpet, flooring, <br />ceiling tile and paint <br />• Plumbing improvements <br />• HVAC repair <br />• Repair/replace intercom and clock systems <br />• Repair/replace interior fixtures such as casework <br />• Provide preschool drop-off loop and additional parking <br />• Site improvements such as irrigation, paving and concrete <br />work <br />• Audio enhancement in every classroom** <br />Program Compatibility • Provide additional storage space <br />• Provide adequate space for full-day kindergarten** <br />• Provide adequate space for preschool** <br />Health and Physical Development • Repair/replace playground surface material <br />• Provide running path <br />Safety and Security • Add exterior cameras <br />• Install camera/intercom security system <br />• Install security partitions <br />• Install electronic security controls <br />• Redesign main entry to provide more control over visitor <br />access <br />Sustainability • Upgrade HVAC controls <br />• Upgrade lighting <br />• Conduct retro-commissioning and repairs <br />• Replace aged boilers with more efficient condensing type <br />Innovation Monarch K-8 is eligible to receive up to $400,000 in additional <br />funds to implement facility improvements that support <br />innovative teaching methods. <br />** Not included in estimated project budget <br />6
The URL can be used to link to this page
Your browser does not support the video tag.