Laserfiche WebLink
OSAB 2016 CIP RECO iDAIONS - PLANNING WdRKSHEET <br />OSAB <br />(H, l'►'I, L) <br />ID <br />Potential 2016 CIP Projects <br />Brief Description <br />1 <br />Trail Improvements <br />Annual maint. to existing trails (Replacing /repairing surfaces, drainage improvements, reseeding trail edge etc.) <br />2 <br />Lastoka Property Conservation <br />Harney Lastoka: preservation of existing farm buildings, development on CSA, interpretive trail, water delivery <br />3 <br />Open Space Zoning <br />Complete research necessary to include OS properties into the Open Space Zone District per the Home Rule Charter <br />4 <br />Open Space & Parks Wayfinding <br />Fabrication and installation of signage & construction of primary trail improvements throughout the City trail system <br />5 <br />Hecla Reservoir Improvements <br />Landscape project to create structural and biological diversity. Native plants and drip irrigation will be installed. <br />6 <br />Boundary Treatments <br />Tasks related to identification of Open Space property boundaries. Examples: surveys, fencing, gates, bollards, signs etc. <br />7 <br />Open Space Management Plan <br />Updating the 2004 Open Space Master Plan to include new properties and update vision/management objectives by property <br />8 <br />Trail Counters <br />To preform usage studies capturing number of users, time of use, high/low use areas, change in use, use on social trails <br />9 <br />Prescribed Burns <br />Reintroduce fire to the Grassland ecosystem. Contracted out to a certified National Wildfire Coordinating Group (NWCG). <br />10 <br />Parking Lot Improvements <br />Improvements to the Daughenbaugh parking lot so that it meets City standards <br />11 <br />Demonstration Gardens <br />Design, install and maintain demonstration gardens composed of native prairie grasses, flowers and shrubs <br />12 <br />Hecla Lake Aeration <br />Installation of an aeration system so that the shallow pond isn't inundated with algae blooms and odors <br />13 <br />New Trails <br />New trail segments identified in the 2014 Open Mouse efforts. Many are neighborhood connections. <br />14 <br />Restroom Improvements <br />Vault restroom at Aquarius parking lot <br />15 <br />Interpretive Education <br />Development, fabrication and installation of environmental inforniation displayed on kiosks, free standing signs etc. <br />OSAB <br />(II, M, L) <br />ID <br />Proposed by OSAB in the .Past <br />Brief Description <br />16 <br />Monitoring/ Inventory Protocols <br />CIP <br />17 <br />Wildlife Management Plans <br />CIP <br />18 <br />Repeat Existing Resource Studies <br />Operational Request <br />19 <br />Increase Staffing <br />Operational Request <br />20 <br />Trail Head Development <br />Kiosks & Restrooms <br />2 1 <br />Acquisition of Land for Dog Park <br />OSAB <br />(II,M,L) <br />ID <br />New OSAB Recommendations <br />Brief Description <br />22 <br />23 <br />24 <br />25 <br />15 <br />