My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Agenda and Packet 2015 03 12
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2015 Planning Commission Agendas Packets Minutes
>
Planning Commission Agenda and Packet 2015 03 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:30:13 AM
Creation date
3/27/2015 9:13:20 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
PCPKT 2015 03 12
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning Commission <br />Meeting Minutes <br />February 12, 2015 <br />Page 2 of 12 <br />Tengler works for Comcast in a completely different division. Pritchard says Tengler was able <br />to participate in the preliminary presentation and he does not see any additional conflict. <br />Pritchard defers to Troy Russ, Planning Department. Russ defers to the judgment of Tengler. <br />Tengler does not recuse himself. <br />Public Notice Certification: <br />Published in the Boulder Daily Camera on January 25, 2015. Posted in City Hall, Public Library, <br />Recreation Center, Courts, and Police Building on January 26, 2015. Mailed to surrounding <br />property owners and property posted on January 26, 2015. <br />Staff Report of Facts and Issues: <br />Sean McCartney presented from Power Point. <br />• Located east of BNSF railroad, west of Highway 42, south of Griffith Street, and north of <br />South Street (also known as Industrial Area and Caledonia Place Subdivisions) <br />• Preliminary PUD /plat /SRU for entire development came before Planning Commission on <br />July 11, 2013 and to City Council on August 20, 2013. <br />• Final Plat /PUD /SRU for DELO Phase 1 and 1A came before Planning Commission on <br />May 8, 2014 and City Council on July 1, 2014. The initial phase included the <br />development of 55 residential townhome units and 1,000 sf of office use to be located in <br />an area bounded by Griffith Street to the north, East Lafayette Street to the south, the <br />Burlington Northern Santa Fe (BNSF) rail road to the west and Cannon Street to the <br />east. It is currently under construction. <br />• DELO Phase 2 is proposed to involve the development of 135 residential units (5 <br />townhomes and 130 apartments) and approximately 31,066 SF commercial /office uses <br />on a parcel of land bounded by East Lafayette Street to the north and east, South Street <br />to the south, and the BNSF rail road to the west. DELO Phase 2, if approved, would be <br />the final phase of the DELO development project. <br />• The approved DELO Phase 1 combined with this Phase 2 request, if approved, would <br />represent a total development of 190 residential units (60 townhomes and 130 <br />apartments) and 32,066 sf of commercial /office uses for the DELO development. The <br />combined totals of these requested final development plans would yield a reduction of <br />54 residential units and an increase of 20,066 sf of commercial /office uses when <br />co o the aNved DELO preliminary PUD. <br />Land Us <br />iminary <br />D <br />Tota nits 24 <br />- THUn 72 <br />- Apt. Unit 172 <br />- Studio /1 Be its 87 <br />- 2/3 bed Apt. u 85 <br />Commercial 12,000 <br />Final Change Notes <br />PIatIPUD <br />190 -54 22% decrease <br />60 - 12 17% decrease <br />130 -42 24% decrease <br />108 + 21 20% increase <br />22 -63 75% decrease <br />31,066 sf + 20,066 sf 158% increase <br />• Streets an • — DELO Phase 2 completes the formal development of Cannon <br />Street, from t` ° ersection of Griffith Street to the intersection of South Street. Between <br />East Lafayette and South Street, Cannon Street is proposed to be designed as a <br />"Woonerf". <br />• Access - Access to the development will be from Short Street, South Street, Cannon <br />Street, and Front Street (a private roadway) located in DELO Phase 1. Possible future <br />traffic signal at 42 and South Street, which CDOT will warrant. <br />• Public Spaces - There are two primary public open space areas dedicated in this PUD: <br />Nawatny Greenway (Outlot B, Outlot C and westerly portion of East Lafayette Street) <br />and Caledonia Plaza (Outlot A). Through discussions with the developer and City <br />officials, it was decided that both open space areas will be dedicated to the City of <br />Louisville but the developer would be responsible for the maintenance (clean up and <br />
The URL can be used to link to this page
Your browser does not support the video tag.