My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Minutes 2015 05 19
PORTAL
>
CITY COUNCIL RECORDS
>
MINUTES (45.090)
>
2015 City Council Minutes
>
City Council Minutes 2015 05 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2022 3:13:00 PM
Creation date
6/10/2015 10:11:17 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Minutes
Original Hardcopy Storage
9C1
Supplemental fields
Test
CCMIN 2015 05 19
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Show annotations
View images
View plain text
City Council <br />Meeting Minutes <br />May 19, 2015 <br />Page 6 of 34 <br />Mayor Muckle requested a staff presentation <br />Planning and Building Safety Director Russ was asked to provide Council with an <br />update on the Hwy 42 Gateway Plan as some members were not on Council when it <br />was presented. <br />LAND USE 2003 — Highway 42 Revitalization Area Framework Plan 2007 — Mixed Use <br />Zoning Adoption (Chapter 17.14 — LMC) <br />TRANSPORTATION Investments: <br />1996 — US 36 /96th Street (Interlocken) Interchange <br />2004 - Highway 42 /96th Street Connection Studies <br />2007 - State Highway 42 Traffic and Access Study <br />2013 - 42 Gateway Alternative Analysis Report <br />Framework Plan Key Recommendations <br />• Higher density mixed use development - South Boulder Road to Little Italy - Little <br />Italy to Miner's Field <br />• Create a more walkable environment similar to Downtown and Old Town. <br />• Little Italy and Miner's Field - Neighborhoods remain unchanged (RM Zoning) <br />• Conduct Corridor Plan for Hwy. 42 Project History Mixed Use Zoning Key <br />Recommendations: <br />• SBR to Little Italy rezoned to MUR & CC <br />• Little Italy to Miner's Field rezoned to MUR & CC <br />• Pine Street Properties Rezoned to MUR <br />• Little Italy and Miner's Field remained zoned RM 4 <br />Project History: 2007 - Hwy 42 Traffic and Access Plan Key Recommendations: <br />• 5 — Lane Roadway <br />• Choice of widening east, or west of Hwy. 42 (south of SBR) - 2.5 acres of parks <br />and open space impacts vs. - 21 property impacts (6 Miner's Field Properties, <br />including the ball field) <br />• $25 to $31 million in (2013 dollars) — Likely no partnerships in either altemative <br />• In 2007, neither alignment considered was considered feasible. <br />2013 Study Key Recommendations: <br />• 3 -Lane Roadway with local street network <br />• Local Network through redevelopment - Steel Ranch — Kaylix Ave - Lanterns — <br />Kay lix Ave - BCHA (Kestrel) — Kaylix Ave - Coal Creek Station — Front St & <br />Cannon Cir - Delo — Cannon St <br />• 3 property Impacts - 1 voluntary (1125 Pine) - 2 TBD (Lathrop & Tebo) <br />• $18 to $20 million in (2013 dollars) <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).