My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Minutes 1993 01 19
PORTAL
>
CITY COUNCIL RECORDS
>
MINUTES (45.090)
>
1970-1999 City Council Minutes
>
1993 City Council Minutes
>
City Council Minutes 1993 01 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:31:35 PM
Creation date
7/30/2004 9:17:49 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Minutes
Signed Date
1/19/1993
Original Hardcopy Storage
2E3
Supplemental fields
Test
CCMIN 1993 01 19
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mayer: <br /> <br />Dreher: <br /> <br />Howard: <br /> <br />avoid redesigning and re-bidding the <br />project at all costs, because if we <br />have to redesign and re-bid the <br />probability is that the low bidder <br />will not again respond, because he <br />will have divulged the basis of his <br />bid and he has lost all advantage, <br />so the cost will be higher. We're <br />structuring the final design based <br />upon a series of different pipe <br />sizes by pipeline segment. On the <br />drawing, instead of seeing the <br />pipeline with fixed dimensions and <br />all of the pertinent structures with <br />fixed dimensions, there will be <br />letter designations on the drawing <br />for various dimensions. There would <br />be tables that would identify which <br />dimensions are used for which <br />particular bidding schedule. The <br />reason for that is to bracket the <br />reasonable possibility of all of the <br />scenarios of who might or might not <br />pull out. If some other entity <br />withdraws, that capacity or some <br />portion of that capacity could <br />become available to you or another <br />project participant, if you wanted <br />to increase your allocation at that <br />point. <br /> <br />As far as joining the NCWD main <br />District, is that something we could <br />do at a later date? <br /> <br />That's correct. You could, at your <br />convenience, go through the <br />petitioning process for inclusion <br />within the District and that would <br />give you control over the timing as <br />to when the back taxes would be due. <br /> <br />If this were to unravel, then it is <br />conceivable that Broomfield can say <br />that they don't care about/for your <br />participation when they take over <br />the project. I f it ' s in <br />Broomfield's best interest to keep <br />us in, even if this formal agreement <br />breaks down, I would like to have us <br />look at the possibility of having <br />Broomfield to have those <br /> <br />9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.