My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Minutes 2015 08 18
PORTAL
>
CITY COUNCIL RECORDS
>
MINUTES (45.090)
>
2015 City Council Minutes
>
City Council Minutes 2015 08 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2022 3:13:00 PM
Creation date
9/2/2015 8:01:19 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Minutes
Original Hardcopy Storage
9C1
Supplemental fields
Test
CCMIN 2015 08 18
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Council <br />Meeting Minutes <br />August 18, 2015 <br />Page 7 of 18 <br />APPROVE CONSTRUCTION SERVICES AGREEMENT WITH CONCRETE <br />EXPRESS, INC. FOR THE LAFAYETTE- LOUISVILLE BOUNDARY AREA <br />DRAINAGE IMPROVEMENTS PHASE 1 CONSTRUCTION <br />Mayor Muckle requested a staff presentation. <br />Public Works Director Kowar explained before the Council is a contract with Concrete <br />Express, Inc. in the amount of $3,569,145.87 and a $400,000.00 staff controlled <br />contingency fund. This contract is with the Urban Drainage and Flood Control District <br />and the City of Lafayette for drainage improvements, which will ultimately perform flood <br />plain mitigation for downtown Louisville and areas along the Lafayette — Louisville <br />Boundary. This is the first phase of the Project which will build a large channel east of <br />Highway 42 through the open space to the Coal Creek Area. The channel and <br />associated drop structures include trail replacement and three bridges and urban flood <br />control and drainage in the future. The second phase of the project is in the process of <br />working through easements with property owners. The second phase is only Louisville <br />improvements from Highway 42 west into the downtown area. <br />Staff Recommendation: Award the construction agreement to Concrete Express, Inc., <br />in the amount of $3,569,145.87 and authorize staff to contract addenda up to <br />$400,000.00 for additional work and project contingency, as well as authorize the Mayor <br />and City Clerk to sign and execute contract documents on behalf of the City. <br />Council member Keany asked if the trails would be hard or soft surface. Public Works <br />Director Kowar stated they would remain soft surface. He noted the Open Space <br />Division had reviewed and approved this phase of the plan. <br />MOTION:. Council memberKeany moved to approve the Construction Services <br />Agreement with Concrete Express, Inc., in the amount of $3,569.145.87, seconded by <br />Council member Loo. Roll call vote was taken. The motion carried by a vote of 6 -0. <br />Absent Council member Lipton. <br />PUBLIC HEARING — 550 SOUTH MCASLIN URBAN RENEWAL PLAN <br />1. RESOLUTION No. 58, SERIES 2015 — A RESOLUTION APPROVING THE <br />550 SOUTH MCCASLIN URBAN RENEWAL PLAN, DESIGNATING SUCH <br />AREA AS APPROPRIATE FOR URBAN RENEWAL PROJECTS PURSUANT <br />TO THE 550 SOUTH MCCASLIN URBAN RENEWAL PLAN, AND FINDING <br />THAT THE ACQUISITION, CLEARANCE, REHABILITATION, <br />CONSERVATION, DEVELOPMENT, REDEVELOPMENT OR A <br />COMBINATION THEREOF OF SUCH AREA IS NECESSARY IN THE <br />
The URL can be used to link to this page
Your browser does not support the video tag.