My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2015 09 01
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2010-2019 City Council Agendas and Packets
>
2015 City Council Agendas and Packets
>
City Council Agenda and Packet 2015 09 01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:08:09 PM
Creation date
9/8/2015 1:00:06 PM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
7A5
Record Series Code
45.010
Supplemental fields
Test
CCAGPKT 2015 09 01
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Trail Request <br />Reviewed and approved by the City of Louisville Open Space Advisory Board and the City <br />Council. <br />1. Overlook Underpass Trail - Connecting Davidson Mesa to the Mayhoffer- Singletree <br />Trail: The underpass at this location is currently under construction and is likely to be <br />complete this fail (2015). The underpass will enable citizen's safe access across <br />Highway 36 which will make a connection possible from the Davidson Mesa trail system <br />to the Mayhoffer - Singletree trail. This connection would allow citizens to access the <br />Cowdrey Draw, Marshall -Mesa, Community Ditch and Doudy Draw trails along with <br />other City of Boulder trails in the Foothills. Louisville would like to continue to work <br />with Boulder County and Superior on this trail alignment and potential future trail <br />construction. Currently, Louisville staff prefers the following three alignments options: <br />West side of the community Ditch, East side of the Community Ditch and Ridgetop. <br />2. Warembourg Trail- Connecting Coal Creek Trail with Rock Creek Trail and the <br />Carolyn Holmberg Preserve at Rock Creek Farm: This trail would provide a second <br />connection between the regional Coal Creek and Rock Creek trails. This segment would <br />be a more direct connection for Louisville residents as it departs from a more central <br />location within the community. This connection would also provide a nice loop <br />experience by connecting into the proposed 104' Street trail, Although this concept is <br />identified as a conceptual trail corridor in the Boulder County Comprehensive Plan <br />additional discussions is needed to determine trail alignment in regards to agricultural <br />areas and privately owned parcels. This Boulder Valley Comprehensive PIan has this <br />recorded as a conceptual trail corridor. <br />3. 104" Street Trail- Connecting Coal Creek Trail with Rock Creek Trail and the <br />Carolyn Holmberg Preserve at Rock Creek Farm: The total trail length would be <br />approximately two miles. This trail would connect the regional Coal Creek trail to the <br />Carolyn Holmberg Preserve at Rock Creek Farm, the regional Rock Creek trail and the <br />Sterns Lake trailhead. <br />4. Dillon Road Crossing and Trail Segment - Connecting Coal Creek Trail to the City <br />of Louisville Power Line Trail: Subject to approval by the City of Louisville Public <br />Works Department, this trail and road crossing would link the regional Coal Creek trail to <br />Louisville's most direct North/South primary trail. This connection would link <br />commuters /trail users to Fireside Elementary, Coal Creek Elementary, the Recreation & <br />Senior Center and South Boulder Road. <br />41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.